MEC01-01898
| Final | 2/14/2002 | 2/15/2002 | 2/15/2002 12:00:00 AM | A | PASS |
|
|
###-####
|
BLD02-00168
| BLD-Framing/Rough-in | 2/14/2002 | 2/15/2002 | 2/15/2002 12:00:00 AM | A | NR |
|
|
BRUCE ###-#### No approved plans on site--informed builder per telephone that plans are required prior to inspection. 2/15/2002 10:28:25 AM
|
BLD01-02814
| BLD-Framing/Rough-in | 2/14/2002 | 2/15/2002 | 2/15/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 02/14/2002 at 14:56:43. Contact: ###-####. c/n 2/15/2002 10:11:48 AM
|
BLD01-02440
| BLD-Final | 2/14/2002 | 2/15/2002 | 2/15/2002 12:00:00 AM | A | FAIL |
|
|
terry-- ###-#### fn--lock box on side of house 193 c/n left on site--tempered glass at south bath and fire caulk on penetration behind water heater in garage. 2/15/2002 10:53:01 AM
|
MEC02-00300
| Rough-in | 2/15/2002 | 2/15/2002 | 2/15/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 02/15/2002 at 07:11:13. Contact: ###-####.
|
BLD01-02901
| BLD-Framing/Rough-in | 2/14/2002 | 2/15/2002 | 2/15/2002 12:00:00 AM | A | NR |
|
|
fr insp ###-####- brian All sign off not completed. 2/15/2002 9:33:39 AM
|
BLD02-00046
| BLD-Other | 2/14/2002 | 2/15/2002 | 2/15/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/14/2002 at 11:54:00. Contact: ###-####. SHEAR-blocking on shear panels not completed, holdowns in garage not installed, nailing light in misc. locations. Completed per plans and call for re-inspection. 2/15/2002 2:38:03 PM
|
MEC02-00202
| Rough-in | 2/15/2002 | 2/15/2002 | 2/15/2002 12:00:00 AM | P | CANC |
|
|
DICK ###-#### DICK CALLED BACK IN TO CANC THIS INSPECTION AS IT WAS THE WRONG ADDRESS...DLD
|
BLD01-02657
| BLD-Final | 2/15/2002 | 2/15/2002 | 2/15/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 02/15/2002 at 09:14:37. Contact: ###-####. c. of c. #22163 issued. 2/15/2002 12:46:58 PM
|
BLD01-02901
| BLD-Framing/Rough-in | 2/15/2002 | 2/15/2002 | 2/15/2002 12:00:00 AM | P | PART |
|
|
###-#### steve c/n posted--ok to insulate pending electrical r. i. approval. 2/15/2002 3:12:59 PM
|
BLD01-02795
| BLD-Final | 2/15/2002 | 2/15/2002 | 2/15/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/15/2002 at 09:50:00. Contact: ###-####. c/n--posted 2/15/2002 1:47:04 PM
|
BLD01-03258
| BLD-Framing/Rough-in | 2/15/2002 | 2/15/2002 | 2/15/2002 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 02/15/2002 at 09:51:14. Contact: ###-####. Cancelled by contractor 2/15/2002 2:38:20 PM
|
BLD02-00223
| BLD-Footing | 2/15/2002 | 2/15/2002 | 2/15/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 02/15/2002 at 10:45:24. Contact: . wip 2/15/2002 1:07:27 PM
|
BLD01-03173
| BLD-Framing/Rough-in | 2/15/2002 | 2/15/2002 | 2/15/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 02/15/2002 at 10:53:41. Contact: ###-####. c/n posted --ok to insulate and side. 2/15/2002 3:23:11 PM
|