Inspections for the day of: Friday, February 15, 2002.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-01496 BLD-Final2/14/20022/15/20022/15/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 02/14/2002 at 09:04:43. Contact: ###-####.ok for temp needs plz perm occ also check handy cap appart ment at final 2/19/2002 5:20:16 PM
BLD01-01068 BLD-Energy code compliance2/14/20022/15/20022/15/2002 12:00:00 AMAPASS
###-#### mike ok to cover 2/15/2002 11:42:20 AM
BLD02-00158 BLD-Framing/Rough-in2/14/20022/15/20022/15/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 02/14/2002 at 11:52:22. Contact: ###-####. lower deck around pool 2/15/2002 10:05:05 AM
BLD01-01870 BLD-Final2/14/20022/15/20022/15/2002 12:00:00 AMAPASS
jim- ###-####- fn
BLD02-00256 BLD-Foundation2/15/20022/15/20022/15/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 02/15/2002 at 07:34:45. Contact: .
BLD01-02902 BLD-Energy code compliance2/15/20022/15/20022/15/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 02/15/2002 at 08:13:32. Contact: ###-####.ok to cover 2/15/2002 2:52:57 PM
BLD01-02288 BLD-Framing/Rough-in2/15/20022/15/20022/15/2002 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 02/15/2002 at 08:23:05. Contact: ###-####. c/n posted on2/7 still not completeed 2/15/2002 4:42:29 PM
MEC02-00460 Pressure Test2/15/20022/15/20022/15/2002 12:00:00 AMPPASS
###-#### lyle
BLD01-01881 BLD-Foundation2/15/20022/15/20022/15/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 02/15/2002 at 10:59:26. Contact: ###-####.rebar for walls 2/15/2002 4:12:04 PM