BLD06-02192
| FIRE-Final Inspection | 2/14/2007 | 2/15/2007 | 2/16/2007 10:13:40 AM | P | PASS |
|
|
life safety passed
|
BLD06-00104
| FIRE-Final Inspection | 2/14/2007 | 2/15/2007 | 2/16/2007 10:12:43 AM | P | PASS |
|
|
life safety finaled
|
BLD06-00102
| FIRE-Final Inspection | 2/14/2007 | 2/15/2007 | 2/16/2007 10:11:44 AM | P | PASS |
|
|
life safety finaled
|
FIR06-00623
| INSP-Final Inspection | 2/14/2007 | 2/15/2007 | 2/16/2007 10:09:52 AM | P | PASS |
|
|
permit finaled
|
FIR06-00993
| INSP-Final Inspection | 2/14/2007 | 2/15/2007 | 2/16/2007 10:08:59 AM | P | PASS |
|
|
permit finaled
|
FIR06-00993
| INSP-Alarm Testing | 2/14/2007 | 2/15/2007 | 2/16/2007 10:07:35 AM | P | PASS |
|
|
permit finaled
|
FIR06-00933
| INSP-Final Inspection | 2/14/2007 | 2/15/2007 | 2/15/2007 6:06:16 PM | A | PASS |
|
|
permit finaled
|
FIR06-00777
| INSP-Sprinkler Rough-in | 2/14/2007 | 2/15/2007 | 2/15/2007 3:41:41 PM | P | FAIL |
|
|
Notified fire sprinkler contractor that the underground supply piping is required to be installed with the top of pipe below 4'-6" of the finish grade. A lively discussion ensued with the outcome being the piping is to be buried as stated, 4'-6".
|
FIR07-00085
| INSP-Alarm Testing | 2/14/2007 | 2/15/2007 | 2/15/2007 3:31:43 PM | A | CANC |
|
|
To be canceled per the contractor due to hvac shutdown problems.
|
BLD06-00122
| FIRE-Final Inspection | 2/14/2007 | 2/15/2007 | 2/15/2007 3:30:00 PM | P | PASS |
|
|
life safety finaled
|
BLD06-00121
| FIRE-Final Inspection | 2/14/2007 | 2/15/2007 | 2/15/2007 3:28:59 PM | P | PASS |
|
|
life safety finaled
|
BLD06-00123
| FIRE-Final Inspection | 2/14/2007 | 2/15/2007 | 2/15/2007 3:25:48 PM | P | PASS |
|
|
life safety finaled
|
BLD06-00124
| FIRE-Final Inspection | 2/14/2007 | 2/15/2007 | 2/15/2007 3:05:26 PM | P | PASS |
|
|
life safety finaled
|
BLD06-00125
| FIRE-Final Inspection | 2/14/2007 | 2/15/2007 | 2/15/2007 3:03:07 PM | P | PASS |
|
|
life safety finaled
|
BLD06-00126
| FIRE-Final Inspection | 2/14/2007 | 2/15/2007 | 2/15/2007 3:02:28 PM | P | PASS |
|
|
life safety finaled
|
FIR06-00929
| INSP-Final Inspection | 2/15/2007 | 2/15/2007 | 2/15/2007 3:00:11 PM | P | PASS |
|
|
permit finaled
|
FIR06-00518
| INSP-Sprinkler Rough-in/Hydro | 2/15/2007 | 2/15/2007 | 2/15/2007 1:53:45 PM | P | PASS |
|
|
Overhead hydro test passed.
|
BLD06-02891
| FIRE-Final Inspection | 2/14/2007 | 2/15/2007 | 2/15/2007 11:44:35 AM | A | PASS |
|
|
Life safety passed. A temporary suite number is to be installed.
|
FIR07-00082
| INSP-Final Inspection | 2/14/2007 | 2/15/2007 | 2/15/2007 10:24:04 AM | A | FAIL |
|
|
Could not final since the ceiling tile is missing. Sprinkler piping is ok to cover.
|
FIR06-00933
| INSP-Sprinkler Rough-in/Hydro | 2/14/2007 | 2/15/2007 | 2/15/2007 9:43:58 AM | A | PASS |
|
|
permit finaled
|
BLD06-00271
| FIRE-Final Inspection | 2/14/2007 | 2/15/2007 | 2/15/2007 8:22:15 AM | A | PASS |
|
|
Life safety finaled
|
BLD07-00032
| FIRE-Final Inspection | 2/14/2007 | 2/15/2007 | 2/15/2007 12:00:00 AM | A | CANC |
|
|
Please coordinate this inspection with the fire alarm inspection already scheduled. I am assuming fire-final is the same as life safety. I did not see life safety as a choice. Thanks for your help. Gary Phone #: ###-####
|