FIR07-00467
| INSP-Final Inspection | 2/15/2008 | 2/15/2008 | 2/15/2008 6:12:01 PM | P | PASS |
|
|
Fire alarm permit finaled.
|
BLD06-00450
| BLD-Final | 2/15/2008 | 2/15/2008 | 2/15/2008 6:11:09 PM | P | FAIL |
|
|
Pending repair of the air handler controls at the fire command center.
|
FIR07-00704
| INSP-Final Inspection | 2/13/2008 | 2/15/2008 | 2/15/2008 4:30:19 PM | P | FAIL |
|
|
Completed test of new fire alarm panel. Found that strobes in corridors were not in-sync and existing strobes in hallways were at 79 inches. As per Sam no changes will need to be made to existing strobes.All other testing per permit Final.
|
FIR07-00854
| INSP-Sprinkler Rough-in | 2/14/2008 | 2/15/2008 | 2/15/2008 4:18:35 PM | P | PART |
|
|
Remainder of of uderground piping ok to cover.KR
|
FIR07-00606
| INSP-Sprinkler Rough-in | 2/14/2008 | 2/15/2008 | 2/15/2008 3:49:12 PM | P | PART |
|
|
Inspection for retaining straps at beam clamp hangers prior to cover at the band, choir and practice rooms including the adjacent restrooms.
|
FIR07-00767
| INSP-Final Inspection | 2/14/2008 | 2/15/2008 | 2/15/2008 3:07:36 PM | A | PASS |
|
|
Corrections verified for compliance, final inspection passed, permit finaled.
|
BLD07-02576
| FIRE-Final Inspection | 2/14/2008 | 2/15/2008 | 2/15/2008 2:09:33 PM | P | FAIL |
|
|
Need amendments to the fire alarm system completed and remainder of finishes in place for fire life safety acceptance.
|
BLD08-00060
| FIRE-Final Inspection | 2/14/2008 | 2/15/2008 | 2/15/2008 2:04:44 PM | P | NR |
|
|
Project is not in condition for final fire life safety acceptance, also need project related fire sprinkler and alarm permit finals prior.
|
FIR07-00465
| INSP-Final Inspection | 2/15/2008 | 2/15/2008 | 2/15/2008 2:02:27 PM | P | PASS |
|
|
Fire alarm permit finaled.
|
FIR08-00046
| INSP-Final Inspection | 2/15/2008 | 2/15/2008 | 2/15/2008 2:00:49 PM | P | PASS |
|
|
Fire alarm permit finaled.
|
FIR07-00467
| INSP-Alarm Testing | 2/15/2008 | 2/15/2008 | 2/15/2008 1:56:25 PM | A | PASS |
|
|
Site fire alarm testing completed.
|
FIR07-00465
| INSP-Alarm Testing | 2/15/2008 | 2/15/2008 | 2/15/2008 1:55:33 PM | A | PASS |
|
|
Fire alarm testing completed satisfactory.
|
FIR07-00029
| INSP-Final Inspection | 2/13/2008 | 2/15/2008 | 2/15/2008 1:52:25 PM | A | PASS |
|
|
Fire sprinkler permit approved for final.
|
FIR07-00140
| INSP-Final Inspection | 2/13/2008 | 2/15/2008 | 2/15/2008 1:51:15 PM | A | PASS |
|
|
Fire sprinkler work passed final inspection, one missing escutcheon installed while on site, permit finaled.
|
FIR07-00141
| INSP-Final Inspection | 2/13/2008 | 2/15/2008 | 2/15/2008 1:49:55 PM | A | PASS |
|
|
Painted escutcheons at two locations replaced while on site, as-built plans accepted, permit finaled.
|
FIR08-00097
| INSP-Sprinkler Rough-in | 2/14/2008 | 2/15/2008 | 2/15/2008 1:47:45 PM | A | PART |
|
|
OH system modifications are good for cover per the scope of permit work.
|
FIR07-00977
| INSP-Sprinkler Rough-in | 2/14/2008 | 2/15/2008 | 2/15/2008 1:45:42 PM | A | PART |
|
|
Conference room heads at the drop ceiling are approved for cover.
|
FIR08-00025
| INSP-Sprinkler Rough-in | 2/14/2008 | 2/15/2008 | 2/15/2008 1:44:39 PM | A | PART |
|
|
Okayed cover at the hard lid ceilings for the elevator lobby- see area indicated on plans, also verified items from previous inspection.
|
BLD08-00180
| FIRE-Final Inspection | 2/15/2008 | 2/15/2008 | 2/15/2008 11:49:34 AM | A | PASS |
|
|
Door hardware repair verified per D. Hannah, fire life safety passed.
|
BLD06-00456
| FIRE-Final Inspection | 2/14/2008 | 2/15/2008 | 2/15/2008 10:32:00 AM | A | PASS |
|
|
Items on correction notice verified for completion, fire life safety finaled.
|
FIR07-00906
| FIR-Aging Inspection | 2/15/2008 | 2/15/2008 | 2/15/2008 10:12:45 AM | | DONE |
|
|
Construction underway, work in progress.
|
FIR07-01008
| INSP-Final Inspection | 2/14/2008 | 2/15/2008 | 2/15/2008 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 2/14/2008 at 4:54:22 PM. Contact: ###-####. - brian w simplex/grinnel called to cancel at 10:45 am
|