FIR08-00026
| INSP-Sprinkler Rough-in | 2/15/2008 | 2/15/2008 | 2/15/2008 4:02:38 PM | P | PASS |
|
|
The underground piping from the stubout to the power pole is ok to cover except for the 22 degree fitting which will need a thrust block.
|
FIR07-01013
| INSP-Sprinkler Rough-in/Hydro | 2/15/2008 | 2/15/2008 | 2/15/2008 3:29:35 PM | P | FAIL |
|
|
The inspection was for above ground hydo tests. The dry system had lost pressure prior to me arriving. I also that the FDC was not being hydro as required. The wet system did have over 200 lbs. The fitter and I decided that all of the testing for buildings 1 and 2 as well as the rough in for buidling 2 will happen on wednesday.
|
BLD06-01694
| FIRE-Final Inspection | 2/14/2008 | 2/15/2008 | 2/15/2008 3:27:22 PM | A | PASS |
|
|
Life safety passed.
|
FIR07-00886
| INSP-Sprinkler Rough-in/Hydro | 2/14/2008 | 2/15/2008 | 2/15/2008 2:32:12 PM | A | CANC |
|
|
Not ready for hydro test.
|
FIR07-00887
| INSP-Sprinkler Rough-in/Hydro | 2/14/2008 | 2/15/2008 | 2/15/2008 2:28:15 PM | A | CANC |
|
|
Wrong inspection number called in.
|
FIR07-00949
| INSP-Sprinkler Rough-in/Hydro | 2/14/2008 | 2/15/2008 | 2/15/2008 2:23:11 PM | A | PASS |
|
|
underground hydro and flush passed
|
BLD07-03247
| FIRE-Final Inspection | 2/14/2008 | 2/15/2008 | 2/15/2008 10:38:20 AM | A | PART |
|
|
A temporary occupancy was given with sam rogers and dave hannimans permission until the racking permit has been taken care of. During the TOC period no product will be allowed to be stored on the racks.
|
BLD07-03232
| FIRE-Final Inspection | 2/14/2008 | 2/15/2008 | 2/15/2008 9:42:40 AM | A | PASS |
|
|
life safety passed. Fire extinguishers have been added in all four units as well as the operation of the existing fire alarms by the apartment maintenance personell.
|