FIR12-00015
| INSP-Sprinkler Rough-in | 2/15/2012 | 2/15/2012 | 2/16/2012 3:37:52 PM | P | PART |
|
|
Overhead work above the grid ceilings approved for cover.
|
FIR11-00611
| INSP-Sprinkler Rough-in/Hydro | 2/15/2012 | 2/15/2012 | 2/16/2012 3:36:15 PM | P | PART |
|
|
Overhead inspection for cover passed. SW head at the west side entry and additional pendent opposite the new demising wall can be verified at final.
|
FIR11-00550
| INSP-Final Inspection | 2/14/2012 | 2/15/2012 | 2/16/2012 3:33:26 PM | P | DEFR |
|
|
|
FIR08-00582
| INSP-Final Inspection | 2/14/2012 | 2/15/2012 | 2/16/2012 11:58:06 AM | P | PASS |
|
|
Scope of fire sprinkler work finished, inspection passed. Permit finaled.
|
BLD10-00380
| BLD-Final | 2/14/2012 | 2/15/2012 | 2/16/2012 8:34:25 AM | A | PASS |
|
|
Verified noted correction items are finished. Fire life safety finaled.
|
FIR11-00587
| INSP-Sprinkler Rough-in | 2/14/2012 | 2/15/2012 | 2/15/2012 10:40:51 AM | A | PART |
|
|
Overhead work at the reception, blood draw, and nurse office remodel area phase one A approved for cover at the grid ceilings.
|