FIR12-00008
| INSP-Sprinkler Rough-in | 2/15/2012 | 2/15/2012 | 2/16/2012 6:16:17 AM | P | PASS |
|
|
Sprinkler modifications in the store room area are complete.
|
BLD11-01660
| FIRE-Final Inspection | 2/13/2012 | 2/15/2012 | 2/16/2012 6:15:51 AM | P | PASS |
|
|
Life safety passed.
|
BLD11-00836
| FIRE-Final Inspection | 2/15/2012 | 2/15/2012 | 2/16/2012 6:15:30 AM | P | FAIL |
|
|
Need the project related fire alarm and fire sprinkler permits addressed. Need the building address posted and the signage provided for the fire sprinkler and fire alarm control panel rooms posted. Need to verify that Chad mounted the knox box.
|
BLD11-01175
| FIRE-Final Inspection | 2/14/2012 | 2/15/2012 | 2/16/2012 6:14:06 AM | A | PASS |
|
|
life safety passed.
|
BLD11-00836
| FIRE-Alarm Testing | 2/15/2012 | 2/15/2012 | 2/15/2012 10:37:31 AM | P | DONE |
|
|
The fire alarm testing is complete except for a copy of the signal reports.
|
FIR11-00479
| INSP-Final Inspection | 2/15/2012 | 2/15/2012 | 2/15/2012 10:09:22 AM | P | FAIL |
|
|
Still need the zone map as discussed and signage on the bell and riser room door. Inspection rescheduled for tomorrow morning per conversation with CM company.
|
FIR11-00642
| INSP-Final Inspection | 2/15/2012 | 2/15/2012 | 2/15/2012 10:07:21 AM | P | FAIL |
|
|
Everything is complete except that to final the project I need the requested alarm report for monday and tuesday. Inspection rescheduled for tomorrow morning per conversation with CM company.
|
FIR11-00563
| INSP-Sprinkler Rough-in | 2/14/2012 | 2/15/2012 | 2/15/2012 8:16:34 AM | A | FAIL |
|
|
No inspection was performed. Called the contact twice and left one message. Walked all four floors of the construction area looking for fitters. Did not final anyone.
|