BLD99-03289
| BLD-Final | 2/15/2000 | 2/16/2000 | 2/16/2000 12:00:00 AM | A | FAIL |
|
|
Ann ###-#### Need other signatures on job card. 2/16/00 2:35:40 PM
|
MEC00-00505
| Rough-in | 2/15/2000 | 2/16/2000 | 2/16/2000 12:00:00 AM | A | PART |
|
|
###-#### Gas line buried, by landscaper, test ok. 2/16/00 2:34:47 PM
|
BLD00-00179
| BLD-Footing | 2/15/2000 | 2/16/2000 | 2/16/2000 12:00:00 AM | A | FAIL |
|
|
ready at 11 Gary ###-#### Rebar not tied in place yet. 2/16/00 2:35:28 PM
|
BLD99-03390
| BLD-Conference | 2/15/2000 | 2/16/2000 | 2/16/2000 12:00:00 AM | A | PART |
|
|
###-#### Gavage pre-existing non-conforming on fire walls. 2/16/00 2:35:06 PM
|
BLD99-03075
| BLD-Final | 2/15/2000 | 2/16/2000 | 2/16/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/15/2000 at 17:55:02. Contact: ###-####. Needs other signatures on card. 2/16/00 2:34:29 PM
|
BLD99-03555
| BLD-Footing | 2/15/2000 | 2/16/2000 | 2/16/2000 12:00:00 AM | A | CANC |
|
|
rod ###-#### Will recall when ready. 2/16/00 2:34:17 PM
|
MEC99-03809
| Final | 2/15/2000 | 2/16/2000 | 2/16/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 02/15/2000 at 11:05:09. Contact: ###-####.
|
BLD00-00178
| BLD-Concrete | 2/16/2000 | 2/16/2000 | 2/16/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 02/16/2000 at 07:20:18. Contact: ###-####.
|
MEC00-00520
| Rough-in | 2/16/2000 | 2/16/2000 | 2/16/2000 12:00:00 AM | P | CANC |
|
|
###-#### trans. to 411. 2/18/00 3:21:19 PM
|