Inspections for the day of: Friday, February 16, 2001.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTom Arcoraci
TitleBLD-COM/RES INSPECTOR
Phone #794-9368
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-02752 BLD-Framing/Rough-in2/15/20012/16/20012/16/2001 12:00:00 AMAPART
###-#### roof sheeting nailing ok parapet sheeting nailing ok parapet sheet rock wip nailing ok ok to rock int walls of elec room at north side of building 2/16/2001 10:59:14 AM
BLD00-03615 BLD-Energy code compliance2/15/20012/16/20012/16/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 02/15/2001 at 15:01:07. Contact: ###-####.
MEC01-00406 Final2/15/20012/16/20012/16/2001 12:00:00 AMANH
Scheduled by a contractor via Hello! on 02/15/2001 at 15:08:25. Contact: ###-####.
BLD00-02574 BLD-Concrete2/15/20012/16/20012/16/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 02/15/2001 at 17:32:24. Contact: ###-####.
BLD00-02574 BLD-Framing/Rough-in2/15/20012/16/20012/16/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 02/15/2001 at 17:33:07. Contact: ###-####.
BLD00-01482 BLD-Final2/16/20012/16/20012/16/2001 12:00:00 AMPPASS
###-#### lc issued 2/20/2001 9:58:33 AM
MEC00-04195 Final2/16/20012/16/20012/16/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 02/16/2001 at 09:35:37. Contact: ###-####.
BLD00-03286 BLD-Framing/Rough-in2/16/20012/16/20012/16/2001 12:00:00 AMPPART
###-#### ok to cover check rear wall rock 2/20/2001 9:59:57 AM
BLD00-03519 BLD-Footing2/16/20012/16/20012/16/2001 12:00:00 AMPPART
pouring at 12:00 as per bob a. put in inspection for footing Scott ###-#### wip 2/20/2001 9:58:19 AM
BLD00-03505 BLD-Conference2/15/20012/16/20012/16/2001 12:00:00 AMPPASS
joe ###-#### need detail for 1hr change from arch 2/20/2001 10:01:42 AM
BLD01-00038 BLD-Foundation2/14/20012/16/20012/16/2001 12:00:00 AMPPART
###-#### hds not in place 2/20/2001 10:00:43 AM