Inspections for the day of: Friday, February 16, 2007.
Number of inspections: 21
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR06-00881 INSP-Sprinkler Rough-in2/16/20072/16/20072/20/2007 10:46:58 AMPPART
See the city approved plans for the only location ok to cover the sprinkler piping. The piping over the restroom has been covered prior to inspection and will need to be uncovered prior to finaling this permit.
FIR06-00824 INSP-Final Inspection2/16/20072/16/20072/20/2007 10:40:03 AMPCANC
Per Ron this will need to be rescheduled.
BLD05-03003 FIRE-Final Inspection2/16/20072/16/20072/16/2007 3:35:29 PMPPART
Life safety in the west wing is passed.
BLD07-00032 FIRE-Final Inspection2/15/20072/16/20072/16/2007 3:29:36 PMAPASS
life safety passed
BLD06-03362 FIRE-Final Inspection2/16/20072/16/20072/16/2007 3:28:54 PMPPART
Final pending installation of emergency lighting as discussed.
FIR07-00125 INSP-Final Inspection2/15/20072/16/20072/16/2007 3:26:41 PMPCANC
Per contractor piping needs to be rerouted around electrical cabinet. No inspection was performed.
FIR06-00987 INSP-Supply line flush2/16/20072/16/20072/16/2007 3:25:05 PMPPASS
Inspection was not for a supply line flush but for an overhead cover/rough-in inspection. Good for cover at the drop ceilings.
FIR07-00085 INSP-Final Inspection2/16/20072/16/20072/16/2007 3:22:25 PMPPASS
permit finaled
FIR07-00085 INSP-Alarm Testing2/15/20072/16/20072/16/2007 3:20:30 PMAPASS
Scheduled by a contractor via Hello! on 2/15/2007 at 4:07:04 PM. Contact: ###-####.
FIR06-00955 INSP-Supply line flush2/15/20072/16/20072/16/2007 2:14:56 PMAPASS
Underground flush passed.
FIR06-00777 INSP-Sprinkler Rough-in2/15/20072/16/20072/16/2007 1:30:46 PMAFAIL
This inspection was for the office areas of the building only. The first problem is the CC upright heads are not installed correctly on the first floor. They exceed the listed 1 1/2" to 4" from the deck.The second problem is the floor plans for the second story area do not match what is existing. Pendants need to be installed in corridors and upright sprinkler heads are missing and additional uprights are going to be required at the office/warehouse separation wall. Thirdly the sprinkler protection for the interior of the outside canopy has been deleted and dry sidewall heads installed to provide protection below. The deleted portion of this sprinkler system was a remote area. Resubmittals, to the city of boise, will be required with all of the changes prior to inspection of the areas that have been effected.
BLD06-03396 FIRE-Final Inspection2/16/20072/16/20072/16/2007 12:18:48 PMAPASS
Life safety finaled
BLD05-03003 FIRE-Final Inspection2/15/20072/16/20072/16/2007 12:18:15 PMACANC
Rescheduled for this afternoon
FIR07-00048 INSP-Final Inspection2/16/20072/16/20072/16/2007 12:17:41 PMPPART
The fire alarm in the west wing is complete. The rest or the scope of work will need to be completed prior to a final sign off.
BLD06-03394 FIRE-Final Inspection2/16/20072/16/20072/16/2007 10:32:54 AMAPASS
life safety finaled
BLD06-03393 FIRE-Final Inspection2/16/20072/16/20072/16/2007 10:32:28 AMAPASS
life safety finaled
BLD06-02192 FIRE-Final Inspection2/15/20072/16/20072/16/2007 10:14:00 AMAPASS
life safety passed
BLD06-00104 FIRE-Final Inspection2/15/20072/16/20072/16/2007 10:13:03 AMAPART
life safety finaled
BLD06-00102 FIRE-Final Inspection2/15/20072/16/20072/16/2007 10:12:07 AMAPASS
life safety finaled
FIR06-00510 INSP-Final Inspection2/16/20072/16/20072/16/2007 10:11:15 AMPPASS
permit finaled
FIR06-00993 INSP-Final Inspection2/16/20072/16/20072/16/2007 10:08:29 AMPPASS
permit finaled