Inspections for the day of: Tuesday, February 16, 2010.
Number of inspections: 1
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorSteven Webb
Title 
Phone #794-9491
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC09-00812 General Inspection2/16/20102/16/20102/16/2010 3:19:04 PMPPART
Walked the dewater trench with MacAlvain (Dean), Walt B. (Boise City). Grading of the trench is almost complete. Made some general comments, including recommended to elevate the north side of the berm at the bend and to make sure that the liner is anchored down properly prior to testing the water flow. As well, reminded Dean to call Inspector 460 for a visual inspection prior to commencment of the water test. Gave Dean my card and informed him to call me if needed. Contractor hopes to test trench with water Wed. p.m. (2/17/10).