ESC09-00812
| General Inspection | 2/16/2010 | 2/16/2010 | 2/16/2010 3:19:04 PM | P | PART |
|
|
Walked the dewater trench with MacAlvain (Dean), Walt B. (Boise City). Grading of the trench is almost complete. Made some general comments, including recommended to elevate the north side of the berm at the bend and to make sure that the liner is anchored down properly prior to testing the water flow. As well, reminded Dean to call Inspector 460 for a visual inspection prior to commencment of the water test. Gave Dean my card and informed him to call me if needed. Contractor hopes to test trench with water Wed. p.m. (2/17/10).
|