ESC09-00162
| DOC - Permit Finaled | 2/16/2011 | 2/16/2011 | 2/16/2011 3:10:58 PM | P | PASS |
|
|
Site has been stabalized.
|
ESC09-00175
| DOC - Permit Finaled | 2/16/2011 | 2/16/2011 | 2/16/2011 3:09:47 PM | P | PASS |
|
|
Work has been completed. Area has been stablalized.
|
BLD10-01547
| DOC - Permit Expired | 2/16/2011 | 2/16/2011 | 2/16/2011 3:07:48 PM | P | PASS |
|
|
Could not get contractor to resolve electrical permit issue. Permiot is expired.
|
BLD10-02900
| BLD-Framing/Rough-in | 2/15/2011 | 2/16/2011 | 2/16/2011 2:59:37 PM | P | PART |
|
|
Dan-PLease call at least 30 mins prior to inspection Phone #: ###-####4. Interior steel stud walls, hardlids and soffits. Did note that back soffit (bridal area) is suspended by the 2nd flor joist. Contractor needs to attach soffit to floor deck or provide engineering showjng that floor joist are capable of suporting the additional load.
|
ESC10-00884
| BMP Violation | 2/16/2011 | 2/16/2011 | 2/16/2011 1:55:21 PM | P | FAIL |
|
|
No effort was made to respolve the previuosly noted issues.
|
BLD10-02817
| BLD-Energy code compliance | 2/16/2011 | 2/16/2011 | 2/16/2011 1:54:49 PM | P | CANC |
|
|
rustin Phone #: ###-####
|
BLD10-02817
| BLD-Framing/Rough-in | 2/16/2011 | 2/16/2011 | 2/16/2011 1:54:17 PM | P | FAIL |
|
|
rustin Phone #: ###-####. Still needs to seal around gas pipe penetration at bottom plate for fireblocking, also, ESC issues have not been resolved.
|
BLD10-02562
| BLD-Framing/Rough-in | 2/15/2011 | 2/16/2011 | 2/16/2011 10:33:06 AM | A | PART |
|
|
John-after 9am please Phone #: ###-####. Needs to provide truss engineering and complete electrical work and get rough in inspection. Will recall for framing inspection.
|