FIR11-00563
| INSP-Sprinkler Rough-in/Hydro | 2/16/2012 | 2/16/2012 | 2/16/2012 5:34:49 PM | P | PART |
|
|
Seismic braces at the 1st floor west end corridor 1 passed reinspection per plan detail. Rough-in at rooms 113 thru 117 okayed for cover as noted- sw heads at rooms 115, 116, 117 are not yet installed. Plans do not show a DSW at room 114.
|
BLD11-02870
| FIRE-Sprinkler Rough-in | 2/16/2012 | 2/16/2012 | 2/16/2012 3:31:51 PM | A | PART |
|
|
Overhead fire sprinkler modifications at the grid ceilings approved for cover. Noted sprinkler head count in the building may now exceed 100.
|
FIR11-00603
| INSP-Alarm Testing | 2/16/2012 | 2/16/2012 | 2/16/2012 3:29:39 PM | A | PART |
|
|
Regarding occupant notification at the blood draw area.
|
BLD11-02505
| FIRE-Sprinkler Rough-in | 2/16/2012 | 2/16/2012 | 2/16/2012 3:28:21 PM | A | PART |
|
|
Ceilings at the opposite side of the new tenant demising wall to be maintained due to existing fire sprinkler protection. New pendent at this area to be installed per approved drawings.
|