MEC17-00615
| Final | 2/15/2017 | 2/16/2017 | 2/16/2017 3:35:13 PM | P | PASS |
|
|
Installation of furnace. Requesting final inspection to be in the afternoon once system has been installed. Call with issues to HVAC sup Eric @ ###-#### ... to coordinate inspection time contact the homeowner Daniel@###-#### Phone #: ###-#### Inspection requested via web by Kayla Pinkham
|
MEC17-00619
| Pressure Test | 2/16/2017 | 2/16/2017 | 2/16/2017 2:35:59 PM | P | NR |
|
|
Meet Brad on site to verify pressure. Gauge will be outside by the meter. Phone #: ###-#### Inspection requested via web by Rick Montgomery
|
MEC16-01390
| Rough-in | 2/15/2017 | 2/16/2017 | 2/16/2017 2:22:08 PM | P | PART |
|
|
Request for R/I Inspection for 1st floor townhouses. R/I inspection for 6th floor. Re-inspection request for dryer vents. R/I inspection for hotel/amenities area. Please contact job lead, Curt, ###-#### with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery 6th floor ok, ist floor condensate needs to be complete for roughin
|
MEC17-00620
| Rough-in | 2/16/2017 | 2/16/2017 | 2/16/2017 1:31:11 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Sheldon Lebow
|
MEC17-00620
| Pressure Test | 2/16/2017 | 2/16/2017 | 2/16/2017 1:30:55 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Sheldon Lebow 20lb gas
|
MEC17-00604
| Pressure Test | 2/15/2017 | 2/16/2017 | 2/16/2017 1:14:21 PM | P | PASS |
|
|
This is for Early PM if possible. Please call Miguel B4 arrival to arrange time and access. Thank you Phone #: ###-#### Inspection requested via web by Diane Day 20lb gas
|
MEC17-00604
| Final | 2/16/2017 | 2/16/2017 | 2/16/2017 1:14:01 PM | P | PASS |
|
|
This is for Early PM if possible. Please call Miguel B4 arrival to arrange time and access. Thank you Phone #: ###-#### Inspection requested via web by Diane Day
|
MEC17-00612
| Final | 2/16/2017 | 2/16/2017 | 2/16/2017 10:42:27 AM | P | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Xanti Berria Inspection cancelled from web by: Xanti Berria
|
MEC17-00516
| Rough-in | 2/15/2017 | 2/16/2017 | 2/16/2017 9:32:36 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by jeremy wanders
|
MEC16-04868
| Final | 2/15/2017 | 2/16/2017 | 2/16/2017 9:12:41 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Lisa Whitney
|
MEC16-04220
| Final | 2/15/2017 | 2/16/2017 | 2/16/2017 8:57:09 AM | A | PASS |
|
|
MEC AND FIREPLACE Phone #: ###-#### Inspection requested via web by Oleg Chervak
|
MEC16-04417
| Final | 2/15/2017 | 2/16/2017 | 2/16/2017 8:56:52 AM | A | PART |
|
|
MEC AND FIREPLACE Phone #: ###-#### Inspection requested via web by Oleg Chervak fresh air opening in the front of the home hase plastic over it
|
MEC16-03236
| Mec-Aging Inspection | 2/16/2017 | 2/16/2017 | 2/16/2017 8:03:10 AM | | PEND |
|
|
|
MEC15-04552
| Mec-Aging Inspection | 2/16/2017 | 2/16/2017 | 2/16/2017 8:02:31 AM | | PEND |
|
|
|