FIR16-00810
| INSP-Sprinkler Rough-in | 2/16/2017 | 2/16/2017 | 2/16/2017 12:47:21 PM | P | PASS |
|
|
Underground hydo test passed. Rough-in inspection passed. Plan modifications are needed since the west sprinkler main/building layout does not match the actual conditions and this will change the hydraulic calculations.
|
BLD16-04198
| FIRE-Final Inspection | 2/16/2017 | 2/16/2017 | 2/16/2017 12:45:54 PM | P | PASS |
|
|
Life safety passed.
|
FIR16-00798
| INSP-Final Inspection | 2/15/2017 | 2/16/2017 | 2/16/2017 12:45:26 PM | P | PASS |
|
|
Permit finaled
|
FIR16-00284
| INSP-Sprinkler Rough-in | 2/15/2017 | 2/16/2017 | 2/16/2017 11:03:58 AM | A | PASS |
|
|
The pendant head has been added in Apartment 204. Piping can be covered.
|
FIR17-00059
| INSP-Final Inspection | 2/15/2017 | 2/16/2017 | 2/16/2017 9:13:42 AM | A | PASS |
|
|
permit finaled
|