BLD14-02837
| FIRE-Final Inspection | 2/16/2018 | 2/16/2018 | 2/16/2018 12:21:39 PM | P | PASS |
|
|
Life safety passed for project scope of work.
Lee Phone #: ###-####
|
BLD17-04025
| FIRE-Final Inspection | 2/15/2018 | 2/16/2018 | 2/16/2018 12:10:09 PM | P | CANC |
|
|
Chad Phone #: ###-####
|
FIR17-00576
| INSP-Sprinkler Rough-in | 2/15/2018 | 2/16/2018 | 2/16/2018 10:51:21 AM | A | PASS |
|
|
Ceiling tile is ok to install as marked on plans except a tile/access is needed at the fire proofing patch locations so work can be verified at the next inspection.
|
BLD17-04297
| FIRE-Conference | 2/16/2018 | 2/16/2018 | 2/16/2018 10:24:14 AM | P | DONE |
|
|
Conference was to discuss whether fire sprinkler protection would be required in the new canopy. Per the fire review comments none are required with conditions
Cody Phone #: ###-####
|
BLD17-02915
| FIRE-Final Inspection | 2/16/2018 | 2/16/2018 | 2/16/2018 10:23:15 AM | P | PART |
|
|
A temporary for life safety is being given until the exit discharge light is installed at the main exit.
Bruce Phone #: ###-####
|
FIR17-00670
| INSP-Sprinkler Rough-in/Hydro | 2/15/2018 | 2/16/2018 | 2/16/2018 9:00:32 AM | A | PASS |
|
|
Overhead hydro test passed
|
BLD17-04532
| FIRE-Final Inspection | 2/15/2018 | 2/16/2018 | 2/16/2018 7:43:37 AM | A | PASS |
|
|
life safety passed
Tim-please call 30 minutes prior to meet for access Phone #: ###-####
|
FIR16-00821
| INSP-Final Inspection | 2/15/2018 | 2/16/2018 | 2/16/2018 12:00:00 AM | A | CANC |
|
|
MIKE IS OUR FOREMAN THIS IS IN CONJUNCTION WITH THE ALARM CONTRACTOR Phone #: ###-#### >> Inspection requested via web by Brad Bettencourt
|
BLD17-00396
| FIRE-Final Inspection | 2/15/2018 | 2/16/2018 | 2/15/2018 3:04:07 PM | A | PASS |
|
|
Life safety passed. Contractor is installing blanks on the dead bolts. Address is installed and a smaller refrigerator has been installed.
Josh Phone #: ###-####
|