FIR17-00700
| INSP-Sprinkler Rough-in | 2/15/2018 | 2/16/2018 | 2/16/2018 1:13:13 PM | P | FAIL |
|
|
Check head spacing throughout project to veirfy proper distance from walls. Hangers will need to be adjusted/added throughout project. FDC piping will need to be completed before FDC can be covered. Cover for overhead fire sprinkler piping is not approved.
|
NAF18-00009
| INSP-Final | 2/14/2018 | 2/16/2018 | 2/16/2018 11:10:19 AM | A | DONE |
|
|
No fire sprinklers, no fire alarms, fire extinguisher is in place with a current inspection tag, noted that main entry has thumb-turn deadbolt on existing door. Final life fire safey inspection for permitted area complete.
|
FIR18-00049
| INSP-Sprinkler Rough-in | 2/15/2018 | 2/16/2018 | 2/16/2018 10:39:50 AM | A | PASS |
|
|
Rough to ocver ibnspection for overhead fire sprinkler piping in area of work complete, approved for cover.
|