MEC99-04220
| Final | 2/16/2000 | 2/17/2000 | 2/17/2000 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 02/16/2000 at 14:28:23. Contact: ###-####. gave to Dixie. 2/17/00 2:11:13 PM
|
BLD00-00267
| BLD-Footing | 2/16/2000 | 2/17/2000 | 2/17/2000 12:00:00 AM | A | NR |
|
|
###-#### shane Recall. 2/17/00 2:10:22 PM
|
BLD00-00156
| BLD-Framing/Rough-in | 2/16/2000 | 2/17/2000 | 2/17/2000 12:00:00 AM | A | FAIL |
|
|
###-#### Ok to side- C/N re: int. shear. 2/17/00 2:10:40 PM
|
BLD99-03573
| BLD-Framing/Rough-in | 2/16/2000 | 2/17/2000 | 2/17/2000 12:00:00 AM | A | PASS |
|
|
###-#### Bruce C/N ok, insul. ok. 2/17/00 2:10:13 PM
|
MEC00-00414
| Pressure Test | 2/16/2000 | 2/17/2000 | 2/17/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/16/2000 at 15:52:58. Contact: ###-####. 9 lbs. fail. 2/17/00 2:10:55 PM
|
BLD00-00348
| BLD-Footing | 2/16/2000 | 2/17/2000 | 2/17/2000 12:00:00 AM | A | PASS |
|
|
Rick ###-#### Ftg. ok. 2/17/00 2:11:05 PM
|
BLD99-03435
| BLD-Final | 2/16/2000 | 2/17/2000 | 2/17/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 02/16/2000 at 11:37:10. Contact: ###-####.
|
MIS00-00019
| BLD-Conference | 2/15/2000 | 2/17/2000 | 2/17/2000 12:00:00 AM | P | PART |
|
|
Rehab request for housing code. Sent form to rehab. 2/18/00 9:40:32 AM
|
BLD99-00682
| BLD-Framing/Rough-in | 2/17/2000 | 2/17/2000 | 2/17/2000 12:00:00 AM | P | PART |
|
|
jim ###-#### fr Grid. 2/18/00 9:40:43 AM
|
BLD00-00241
| BLD-Footing | 2/17/2000 | 2/17/2000 | 2/17/2000 12:00:00 AM | P | PART |
|
|
###-#### Ftg. side set back ok. 2/18/00 9:40:54 AM
|
BLD00-00040
| BLD-Conference | 2/17/2000 | 2/17/2000 | 2/17/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 02/17/2000 at 10:45:24. Contact: ###-####. left phone msg. 2/18/00 9:41:03 AM
|