Inspections for the day of: Tuesday, February 17, 2004.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR04-00050 INSP-Final Inspection2/13/20042/17/20042/17/2004 12:00:00 AMAFAIL
Need ceiling tile installed 2/17/2004 11:19:42 AM
FIR04-00080 INSP-Final Inspection2/13/20042/17/20042/17/2004 12:00:00 AMACANC
dave ; Phone #: ###-#### Internet Inspection Request from: Annette Moore
FIR04-00102 INSP-Final Inspection2/13/20042/17/20042/17/2004 12:00:00 AMACANC
dave ; Phone #: ###-#### Internet Inspection Request from: Annette Moore
FIR04-00103 INSP-Final Inspection2/13/20042/17/20042/17/2004 12:00:00 AMACANC
dave ; Phone #: ###-#### Internet Inspection Request from: Annette Moore
FIR03-00448 INSP-Sprinkler Rough-in/Hydro2/16/20042/17/20042/17/2004 12:00:00 AMAPART
Sprinkler piping tie-ins from the second to the third floor are connected and ok for cover 2/17/2004 11:44:43 AM
FIR03-00678 INSP-Final Inspection2/12/20042/17/20042/17/2004 12:00:00 AMAFAIL
The system was not tested. The manual pull station is not between 10' and 20' per IMC 2/17/2004 10:10:10 AM
FIR04-00007 INSP-Final Inspection2/12/20042/17/20042/17/2004 12:00:00 AMPPASS
fire alarm finaled 2/17/2004 3:41:02 PM
BLD02-03083 FIRE-Final Inspection2/13/20042/17/20042/17/2004 12:00:00 AMPFAIL
Provide annual inspection tag for the fire extinguishers. Provide "Door to remain unlocked during business hours" sticker at the main entry/exit. Remove manual flush bolts per review note #7 on the main entry/exit. Remove thumb turn from the rear exit. Provide approved door hardware on the rear exit. Provide exit signs and emergency light in the basement per plans. Provide fire extinguisher in the basement with current inspection tag mounted at 48" above finish floor 2/17/2004 3:34:29 PM
FIR04-00063 INSP-Sprinkler Rough-in/Hydro2/17/20042/17/20042/17/2004 12:00:00 AMPFAIL
Resubmitted plans have not been issued yet. Resubmitted plans address 14.5 x 14.5 spacing of the sprinkler pendants 2/17/2004 1:14:05 PM
BLD02-03088 FIRE-Final Inspection2/17/20042/17/20042/17/2004 12:00:00 AMPFAIL
Need metal sample tubes in return air ducts since they exceed 1 1/2' in width. Third hvac unit that serves the 2nd story needs to have automatic shutdown per UMC since there is no separation between the 1st story and 2nd story systems 2/17/2004 4:00:03 PM
FIR03-00628 INSP-Final Inspection2/17/20042/17/20042/17/2004 12:00:00 AMPPASS
Permit finaled