BLD05-00627
| FIRE-Final Inspection | 2/17/2006 | 2/17/2006 | 2/17/2006 5:29:50 PM | P | FAIL |
|
|
When the fire alarm permit is finaled this permit can be finaled.
|
BLD04-03009
| FIRE-Final Inspection | 2/17/2006 | 2/17/2006 | 2/17/2006 5:28:50 PM | P | PASS |
|
|
fire life safety finaled
|
FIR05-00651
| INSP-Final Inspection | 2/17/2006 | 2/17/2006 | 2/17/2006 3:08:05 PM | P | CANC |
|
|
Unable to get elevator contractor to site for adjustments
|
BLD04-02470
| FIRE-Conference | 2/16/2006 | 2/17/2006 | 2/17/2006 1:33:54 PM | A | DONE |
|
|
I went over the life safety comments with Vern. Issues will be fire dept access, addressing and the fire sprinklers getting finaled. Door hardware will be addressed in the T.I. stage.
|
BLD05-02735
| FIRE-Sprinkler Rough-in | 2/16/2006 | 2/17/2006 | 2/17/2006 11:59:46 AM | A | DONE |
|
|
Went over locations for fire extinguishers with the superintendant
|
FIR06-00099
| INSP-Final Inspection | 2/16/2006 | 2/17/2006 | 2/17/2006 10:58:42 AM | A | PASS |
|
|
Fire sprinklers finaled
|
BLD05-00627
| FIRE-Final Inspection | 2/16/2006 | 2/17/2006 | 2/17/2006 9:37:02 AM | A | FAIL |
|
|
Need to final the fire alarm permit, repair the exit sign in storage and provide emergency lighting in the new framing shop
|
FIR05-00651
| INSP-Final Inspection | 2/15/2006 | 2/17/2006 | 2/17/2006 9:34:23 AM | A | FAIL |
|
|
Need to test the smoke detector at the top of the shaft and the flashing hat is not working
|
FIR05-00731
| INSP-Supply line flush | 2/16/2006 | 2/17/2006 | 2/17/2006 9:30:46 AM | P | CANC |
|
|
Contact: Steve; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley Inspection cancelled from web by: Alicia Pauley
|
FIR05-00562
| INSP-Final Inspection | 2/15/2006 | 2/17/2006 | 2/17/2006 9:18:27 AM | A | PASS |
|
|
permit finaled
|