Inspections for the day of: Tuesday, February 17, 2009.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC07-01486 Random Inspection2/17/20092/17/20092/17/2009 3:44:35 PMPDONE
Did not view entire project due to access point locked off. No issues present on the west end of project area.
ESC07-00380 Site Final2/17/20092/17/20092/17/2009 3:34:23 PMPPASS
ESC04-01301 Site Final2/17/20092/17/20092/17/2009 3:27:36 PMPPASS
ESC08-00081 Random Inspection2/17/20092/17/20092/17/2009 3:12:40 PMPPASS
ESC08-00082 Random Inspection2/17/20092/17/20092/17/2009 3:12:15 PMPPASS
ESC08-00083 Random Inspection2/17/20092/17/20092/17/2009 3:11:56 PMPPASS
ESC05-01615 Site Final2/17/20092/17/20092/17/2009 2:44:48 PMPPASS
ESC08-00991 BMP Violation2/13/20092/17/20092/17/2009 2:18:44 PMAPASS
All issues dealt with.
ESC06-01866 Site Final2/17/20092/17/20092/17/2009 12:04:45 PMPPASS
ESC06-01823 Site Final2/17/20092/17/20092/17/2009 12:04:02 PMPPASS
ESC08-00491 Tracking Control2/13/20092/17/20092/17/2009 11:01:58 AMPFAIL
Verbal to RP (George):
1. Maintain Costruction access.
2. Clean up all hard surfaces along the perimeter of project area. (Sidewalks and gutter pan)
Will re-inspect on 2/23/09 PM.
ESC08-00749 Random Inspection2/17/20092/17/20092/17/2009 10:03:24 AMAFAIL
Verbal to Contractor:
1. Remove stock pile off of sidewalk.
2. Provide a sediemnt barrier along front of lot or move stock pile where there will not be a threat of any erosion that could impead into the gutterpan into the storm drain system. Will accept a relief trench with pushing stock piles back also. Trench must be at a minimum 6" deep by 10" wigth.
Will re-inspect on 2/23/09.