FIR09-00703
| INSP-Final Inspection | 2/17/2010 | 2/17/2010 | 2/17/2010 4:09:11 PM | P | PASS |
|
|
Permit finaled
|
FIR10-00009
| INSP-Final Inspection | 2/17/2010 | 2/17/2010 | 2/17/2010 3:08:28 PM | P | PASS |
|
|
Permit finaled. The NetCon was a 5.
|
BLD10-00162
| FIRE-Final Inspection | 2/16/2010 | 2/17/2010 | 2/17/2010 3:07:24 PM | P | FAIL |
|
|
Provide single action hardware for the double exit doors out the north side of the building. This is due to the west exit doors already having keyed hardware with the sticker and indicator. Provide one additional emergency light in the new open office area and the adjacent corridor just to the south. Also all of the exit signs need repaired.
|
FIR09-00494
| INSP-Sprinkler Rough-in/Hydro | 2/17/2010 | 2/17/2010 | 2/17/2010 1:36:24 PM | A | PASS |
|
|
Overhead hydro test passed.
|