Inspections for the day of: Tuesday, February 17, 2015.
Number of inspections: 14
Percentage of inspections complete: 79 %
Percentage of inspections not complete: 21 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR14-00870 INSP-Final Inspection2/5/20152/10/2015 P 
Forrest, The school district would like to schedule the test for 3:30 on Tuesday if at all possible. Please let me know as soon as possible if that will work so I can confirm it with them. Thank you. Jason ###-#### Phone #: ###-#### >> Inspection requested via web by Jason Minnick
FIR14-00708 INSP-Sprinkler Rough-in2/10/20152/10/2015 P 
Rough to cover 2nd floor F. ###-#### Phone #: ###-#### >> Inspection requested via web by Scott Carter II
FIR14-00681 INSP-Sprinkler Rough-in/Hydro2/10/20152/10/2015 P 
Partial rough to cover bldg D 1st floor (soffits/hard lids ) ###-#### Leroy >> Inspection requested via web by Scott Carter II
BLD14-02958 FIRE-Final Inspection2/13/20152/17/20152/18/2015 7:20:43 AMAPASS
Fire life safety finaled.
FIR15-00070 INSP-Sprinkler Rough-in2/17/20152/17/20152/18/2015 7:19:30 AMPDEFR
FIR14-00866 INSP-Sprinkler Rough-in/Hydro2/13/20152/17/20152/17/2015 3:03:01 PMAPART
This inspection will be on the 2nd floor. Jeremiah R is your contact. Please call 1/2 hour prior to inspection. Phone #: ###-#### Inspection requested via web by Stan Beus
FIR14-00410 INSP-Final Inspection2/17/20152/17/20152/17/2015 2:59:40 PMPDEFR
Overbooked
FIR14-00815 INSP-Sprinkler Rough-in/Hydro2/16/20152/17/20152/17/2015 2:48:56 PMAPART
UG fire supply line hydrostatic test completed acceptable.
FIR15-00057 INSP-Final Inspection2/13/20152/17/20152/17/2015 2:21:49 PMPPASS
Fire sprinkler permit finaled.
FIR15-00057 INSP-Sprinkler Rough-in2/13/20152/17/20152/17/2015 2:19:02 PMPPART
Overhead work passed rough-in inspection.
FIR15-00065 INSP-Sprinkler Rough-in2/17/20152/17/20152/17/2015 12:18:12 PMPPART
Overhead modifications at the 14th floor okayed for cover per the scope of work. Fire sprinkler work at the 15th floor also approved for cover with the exception of overspacing between two heads at the SW hallway as noted on plans. To be adjusted and verified at final inspection.
FIR14-00661 INSP-Final Inspection2/12/20152/17/20152/17/2015 10:57:30 AMAPART
Completed functional testing of the common area horns and strobes per the written scope of work at floor levels basement thru 3rd. Missing approved plans on site for verification of design and install- final pending.
BLD15-00311 FIRE-Final Inspection2/13/20152/17/20152/17/2015 9:58:00 AMAPASS
Fire life safety inspection passed provided two existing EM lights are repaired.
FIR15-00057 INSP-Sprinkler Rough-in/Hydro2/13/20152/17/20152/13/2015 1:04:42 PMPCANC
Phone #: ###-#### >> Inspection requested via web by Anthony Child Inspection cancelled from web by: Anthony Child