FIR16-00494
| INSP-Final Inspection | 2/16/2017 | 2/17/2017 | 2/17/2017 2:23:59 PM | P | PASS |
|
|
Permit finaled
|
FIR16-00666
| INSP-Final Inspection | 2/17/2017 | 2/17/2017 | 2/17/2017 2:23:41 PM | P | PASS |
|
|
Permit finaled
|
FIR17-00033
| INSP-Final Inspection | 2/15/2017 | 2/17/2017 | 2/17/2017 2:23:26 PM | P | PASS |
|
|
Permit finaled
|
FIR17-00031
| INSP-Final Inspection | 2/16/2017 | 2/17/2017 | 2/17/2017 11:44:50 AM | A | FAIL |
|
|
Phone lines had not been programed to call out so testing on my part was stopped that that the contractor could perform their required testing. Scott stated that the existing manual pull stations and notification devices that do not meet code heigth requirements can remain due to this specific scope of work. Also Tony is doing a great job of cleaning up the wiring in the panel.
|
FIR16-00810
| INSP-Supply line flush | 2/16/2017 | 2/17/2017 | 2/17/2017 10:24:28 AM | A | PASS |
|
|
Underground supply line flush passed
|
FIR16-00052
| INSP-Final Inspection | 2/15/2017 | 2/17/2017 | 2/17/2017 10:24:01 AM | A | PASS |
|
|
Permit finaled
|