BLD99-03563
| BLD-Footing | 2/17/2000 | 2/18/2000 | 2/18/2000 12:00:00 AM | A | FAIL |
|
|
late am ###-#### N/R use special insp. if want to place before 2/22/00 Tue. pend report. 2/22/00 10:14:47 AM
|
BLD00-00235
| BLD-Framing/Rough-in | 2/17/2000 | 2/18/2000 | 2/18/2000 12:00:00 AM | A | FAIL |
|
|
bob ###-#### fr No access to bldg. unable to see if beam's were reeingieered for size. 2/22/00 10:15:09 AM
|
BLD99-02669
| BLD-Framing/Rough-in | 2/17/2000 | 2/18/2000 | 2/18/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 02/17/2000 at 17:29:48. Contact: ###-####. Pend report on 10ft. grout crft. placement & rebar. 2/22/00 10:14:19 AM
|
BLD00-00005
| BLD-Framing/Rough-in | 2/17/2000 | 2/18/2000 | 2/18/2000 12:00:00 AM | A | FAIL |
|
|
###-#### or ###-#### Gable truss vent void engineering provide fix kraft back insulation on rafters 2nd floor cover or remove. 2/22/00 10:14:01 AM
|
BLD99-03678
| BLD-Other | 2/17/2000 | 2/18/2000 | 2/18/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 02/17/2000 at 15:24:15. Contact: ###-####. Fire stopping req/ok to drop ceiling all but at occ separation wall/ need mec. & fire roughing. 2/22/00 10:11:08 AM
|
BLD00-00300
| BLD-Footing | 2/17/2000 | 2/18/2000 | 2/18/2000 12:00:00 AM | P | CANC |
|
|
rready at 1 ###-####
|
BLD99-03714
| BLD-Final | 2/18/2000 | 2/18/2000 | 2/18/2000 12:00:00 AM | P | PART |
|
|
larry ###-#### ADA shower lead req. 2/22/00 10:12:10 AM
|
BLD99-02816
| BLD-Foundation | 2/18/2000 | 2/18/2000 | 2/18/2000 12:00:00 AM | P | PASS |
|
|
###-#### Walls ok. 2/22/00 10:13:13 AM
|
BLD00-00376
| BLD-Foundation | 2/18/2000 | 2/18/2000 | 2/18/2000 12:00:00 AM | P | PASS |
|
|
###-####-jeff- per jim 1:30 Ft ok setback ok. 2/22/00 10:13:23 AM
|
BLD99-02029
| BLD-Framing/Rough-in | 2/18/2000 | 2/18/2000 | 2/18/2000 12:00:00 AM | P | PART |
|
|
###-#### Firewall 1st floor ok. 2/22/00 10:10:49 AM
|
MEC00-00546
| Rough-in | 2/18/2000 | 2/18/2000 | 2/18/2000 12:00:00 AM | P | PASS |
|
|
Return air ducted in ceiling/floor.
|
BLD00-00180
| BLD-Framing/Rough-in | 2/17/2000 | 2/18/2000 | 2/18/2000 12:00:00 AM | P | PASS |
|
|
Jim Campell ###-#### Frame passed archieved ceiliing engineering C/N pending welding approval from special indp. 2/22/00 10:12:37 AM
|
BLD99-02783
| BLD-Framing/Rough-in | 2/17/2000 | 2/18/2000 | 2/18/2000 12:00:00 AM | P | PASS |
|
|
Jim Campell ###-#### Archieved engineering for ceiling framing C/N welds must be approved. 2/22/00 10:13:04 AM
|
BLD99-02049
| BLD-Concrete | 2/17/2000 | 2/18/2000 | 2/18/2000 12:00:00 AM | P | PART |
|
|
tom ###-#### --upstand beam w. end of the 4th level--columns- grid # 1-b,c,d,e, & f Pend SSI report. 2/22/00 10:11:51 AM
|
BLD98-03274
| BLD-Final | 2/17/2000 | 2/18/2000 | 2/18/2000 12:00:00 AM | P | FAIL |
|
|
for homeowner --jim --work ###-#### ---call 1st before insp Self closing hardware. 2/22/00 10:10:40 AM
|