Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD99-03563 BLD-Footing2/17/20002/18/20002/18/2000 12:00:00 AMAFAIL
late am ###-#### N/R use special insp. if want to place before 2/22/00 Tue. pend report. 2/22/00 10:14:47 AM
BLD00-00235 BLD-Framing/Rough-in2/17/20002/18/20002/18/2000 12:00:00 AMAFAIL
bob ###-#### fr No access to bldg. unable to see if beam's were reeingieered for size. 2/22/00 10:15:09 AM
BLD99-02669 BLD-Framing/Rough-in2/17/20002/18/20002/18/2000 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 02/17/2000 at 17:29:48. Contact: ###-####. Pend report on 10ft. grout crft. placement & rebar. 2/22/00 10:14:19 AM
BLD00-00005 BLD-Framing/Rough-in2/17/20002/18/20002/18/2000 12:00:00 AMAFAIL
###-#### or ###-#### Gable truss vent void engineering provide fix kraft back insulation on rafters 2nd floor cover or remove. 2/22/00 10:14:01 AM
BLD99-03678 BLD-Other2/17/20002/18/20002/18/2000 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 02/17/2000 at 15:24:15. Contact: ###-####. Fire stopping req/ok to drop ceiling all but at occ separation wall/ need mec. & fire roughing. 2/22/00 10:11:08 AM
BLD00-00300 BLD-Footing2/17/20002/18/20002/18/2000 12:00:00 AMPCANC
rready at 1 ###-####
BLD99-03714 BLD-Final2/18/20002/18/20002/18/2000 12:00:00 AMPPART
larry ###-#### ADA shower lead req. 2/22/00 10:12:10 AM
BLD99-02816 BLD-Foundation2/18/20002/18/20002/18/2000 12:00:00 AMPPASS
###-#### Walls ok. 2/22/00 10:13:13 AM
BLD00-00376 BLD-Foundation2/18/20002/18/20002/18/2000 12:00:00 AMPPASS
###-####-jeff- per jim 1:30 Ft ok setback ok. 2/22/00 10:13:23 AM
BLD99-02029 BLD-Framing/Rough-in2/18/20002/18/20002/18/2000 12:00:00 AMPPART
###-#### Firewall 1st floor ok. 2/22/00 10:10:49 AM
MEC00-00546 Rough-in2/18/20002/18/20002/18/2000 12:00:00 AMPPASS
Return air ducted in ceiling/floor.
BLD00-00180 BLD-Framing/Rough-in2/17/20002/18/20002/18/2000 12:00:00 AMPPASS
Jim Campell ###-#### Frame passed archieved ceiliing engineering C/N pending welding approval from special indp. 2/22/00 10:12:37 AM
BLD99-02783 BLD-Framing/Rough-in2/17/20002/18/20002/18/2000 12:00:00 AMPPASS
Jim Campell ###-#### Archieved engineering for ceiling framing C/N welds must be approved. 2/22/00 10:13:04 AM
BLD99-02049 BLD-Concrete2/17/20002/18/20002/18/2000 12:00:00 AMPPART
tom ###-#### --upstand beam w. end of the 4th level--columns- grid # 1-b,c,d,e, & f Pend SSI report. 2/22/00 10:11:51 AM
BLD98-03274 BLD-Final2/17/20002/18/20002/18/2000 12:00:00 AMPFAIL
for homeowner --jim --work ###-#### ---call 1st before insp Self closing hardware. 2/22/00 10:10:40 AM