BLD99-01597
| FIRE-Final Inspection | 2/17/2000 | 2/18/2000 | 2/18/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/17/2000 at 11:58:20. Contact: ###-####. Multi family residence probably should be structural insp. 2/18/00 3:31:25 PM
|
BLD99-03750
| FIRE-Final Inspection | 2/17/2000 | 2/18/2000 | 2/18/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/17/2000 at 14:34:13. Contact: ###-####. Should have been structural insp. Resisdence. 2/18/00 3:31:42 PM
|
FIR00-00066
| INSP-Sprinkler Rough-in | 2/17/2000 | 2/18/2000 | 2/18/2000 12:00:00 AM | P | PART |
|
|
john ###-#### Reinsp. ok on sprinkler R/I. 2/22/00 10:03:22 AM
|
FIR00-00067
| INSP-Sprinkler Rough-in | 2/17/2000 | 2/18/2000 | 2/18/2000 12:00:00 AM | P | PART |
|
|
john ###-#### Reinsp ok on sprinkler r/I. 2/22/00 10:03:08 AM
|
FIR00-00068
| INSP-Sprinkler Rough-in | 2/17/2000 | 2/18/2000 | 2/18/2000 12:00:00 AM | P | PART |
|
|
john ###-#### Ok on sprinkler R/I. 2/22/00 10:02:39 AM
|
FIR00-00069
| INSP-Sprinkler Rough-in | 2/17/2000 | 2/18/2000 | 2/18/2000 12:00:00 AM | P | PART |
|
|
###-#### Ok on sprinkler r/I. 2/22/00 10:02:50 AM
|