Inspections for the day of: Wednesday, February 18, 2004.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorPat Lass
TitleELE-INSPECTOR
Phone #794-9478
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE02-03121 ELE-Aging Inspection2/18/20042/18/20042/18/2004 12:00:00 AM NR
suc 2/18/2004 2:50:24 PM
ELE02-03624 ELE-Aging Inspection2/18/20042/18/20042/18/2004 12:00:00 AM NR
contractor said it is still under construction 2/18/2004 2:49:55 PM
ELE03-02872 ELE-Aging Inspection2/18/20042/18/20042/18/2004 12:00:00 AM NR
suc 2/19/2004 2:14:45 PM
also see #2916 2/19/2004 2:16:07 PM
ELE04-00429 Permanent Service2/17/20042/18/20042/18/2004 12:00:00 AMAFAIL
call for access--joe-- 941-259
4 wire to ranges and dryer 2/18/2004 11:34:47 AM
ELE04-00274 Electrical Rough-In2/17/20042/18/20042/18/2004 12:00:00 AMAFAIL
brian ; Phone #: ###-#### Internet Inspection Request from: Annette Moore
6 In. free conductor. 2/18/2004 9:33:40 AM
ELE04-00441 Rough-In Permanent Service2/17/20042/18/20042/18/2004 12:00:00 AMAPASS
This is the Parkview Bible Fellowship Church. We installed 2 new 20amp 120volt circuits (#29 & #30) to feed 3 new receptacles in the open room that is backed up to the west wall of the electrical room. 1 recept. is low on this common wall, and the other 2 recepts. are above the countertop on the wall that t-bones into the electrical room west wall. Anyone there should be able to give you the tour. If you have any questions, give me a call. Thanks !!!!; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell
no service 2/18/2004 8:28:38 AM
ELE04-00446 Rough-In Permanent Service2/17/20042/18/20042/18/2004 12:00:00 AMAPASS
###-#### gary
R/I Ok
P/S U/G N Ok 2/18/2004 9:05:26 AM
ELE04-00361 Electrical Rough-In2/17/20042/18/20042/18/2004 12:00:00 AMPPART
###-####. Scheduled by a contractor via Hello! on 2/17/2004 at 9:53:04 PM. Contact: ###-####. 2/18/2004 12:46:51 PM
1st floor waiting room walls ok 2/18/2004 4:05:35 PM
ELE04-00423 Final2/18/20042/18/20042/18/2004 12:00:00 AMPPASS
FINAL FOR CODE CORRECTIONS IN BASEMENT,NEW A/C CIRCUIT, NEW 100 AMP BRANCH PANEL IN BASEMENT,NEW 20 AMP 120 VOLT CIRCUIT TO THE DETACHED GARAGE.WOLD LIKE AS CLOSE TO NOON AS POSS. IF ANY QUESTIONS PLEASE CALL DELBERT @ ###-####.; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH
ELE03-04047 Rough-In Permanent Service2/11/20042/18/20042/18/2004 12:00:00 AMPPASS
We ran a new 230volt circuit from the indoor apartment panel to the new instant water heater unit in the bathroom. We installed a breaker lock-off bracket on this breaker. Please call the property mgrs: Odeanna or John, both @ ###-####, with 20 minutes notice to meet you for access. This work is in Apartment #5. THANKS !!!!!!!; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell