FIR03-00701
| FIR-Aging Inspection | 2/18/2004 | 2/18/2004 | 2/18/2004 12:00:00 AM | | NR |
|
|
I spoke to Mike with General Fire and he will get it called in next week if the work has been completed by St. Alphonsas 2/18/2004 2:55:16 PM
|
FIR03-00684
| INSP-Final Inspection | 2/17/2004 | 2/18/2004 | 2/18/2004 12:00:00 AM | A | PASS |
|
|
fire sprinklers finaled 2/18/2004 11:14:20 AM
|
MIS03-00052
| FIR-Final | 2/18/2004 | 2/18/2004 | 2/18/2004 12:00:00 AM | A | PASS |
|
|
life safety finaled
|
FIR04-00034
| INSP-Final Inspection | 2/13/2004 | 2/18/2004 | 2/18/2004 12:00:00 AM | A | PASS |
|
|
robert; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD02-03088
| FIRE-Final Inspection | 2/17/2004 | 2/18/2004 | 2/18/2004 12:00:00 AM | A | PASS |
|
|
fire life safety finaled. Structural inspection please verify correct door hardware on the three exterior exits. 2/18/2004 9:34:03 AM
|
BLD02-03083
| FIRE-Final Inspection | 2/17/2004 | 2/18/2004 | 2/18/2004 12:00:00 AM | A | FAIL |
|
|
Exit signs and emergency lights in basement still need completed. Manual flush bolts on the main entry/exit have not been addressed per the correction notice 2/18/2004 10:26:05 AM
|
BLD03-00602
| FIRE-Sprinkler Rough-in | 2/17/2004 | 2/18/2004 | 2/18/2004 12:00:00 AM | P | CANC |
|
|
Inspection was for covering the sprinkler piping on the 2nd floor. See sprinkler permit for history. 2/18/2004 3:30:00 PM
|
BLD03-01798
| FIRE-Final Inspection | 2/17/2004 | 2/18/2004 | 2/18/2004 12:00:00 AM | P | FAIL |
|
|
Provide approved door hardware on the southeast exterior door. Final fire alarm system 2/18/2004 4:00:49 PM
|
FIR04-00080
| INSP-Final Inspection | 2/17/2004 | 2/18/2004 | 2/18/2004 12:00:00 AM | P | PASS |
|
|
hood system operated correctly. Pull stations are located at the appliance 2/18/2004 2:50:44 PM
|
FIR04-00102
| INSP-Final Inspection | 2/17/2004 | 2/18/2004 | 2/18/2004 12:00:00 AM | P | PASS |
|
|
hood system operated correctly. Pull stations are located at the appliance 2/18/2004 2:50:53 PM
|
FIR04-00103
| INSP-Final Inspection | 2/17/2004 | 2/18/2004 | 2/18/2004 12:00:00 AM | P | PASS |
|
|
hood system operated correctly. Pull stations are located at the appliance 2/18/2004 2:51:13 PM
|
FIR03-00731
| INSP-Final Inspection | 2/17/2004 | 2/18/2004 | 2/18/2004 12:00:00 AM | P | FAIL |
|
|
Provide correct batteries for facp. Repair the exterior alarm bell 2/18/2004 3:59:52 PM
|
FIR03-00554
| INSP-Sprinkler Rough-in/Hydro | 2/18/2004 | 2/18/2004 | 2/18/2004 12:00:00 AM | P | PART |
|
|
second floor insulation ok and sprinkler piping is ok to cover
|
FIR03-00801
| INSP-Final Inspection | 2/18/2004 | 2/18/2004 | 2/18/2004 12:00:00 AM | P | PASS |
|
|
fire sprinklers finaled
|
BLD02-03083
| FIRE-Final Inspection | 2/18/2004 | 2/18/2004 | 2/18/2004 12:00:00 AM | P | PASS |
|
|
Fire life safety finaled.
|
BLD04-00143
| FIRE-Final Inspection | 2/18/2004 | 2/18/2004 | 2/18/2004 12:00:00 AM | P | PART |
|
|
A temporary occupancy was given until the three point lock is installed on the main entry/exit. This is to replace the manual flush bolts.
|
BLD04-00230
| FIRE-Final Inspection | 2/18/2004 | 2/18/2004 | 2/18/2004 12:00:00 AM | P | PART |
|
|
A temporary occupancy was given until the three point lock is installed on the main entry/exit. This is to replace the manual flush bolts.
|
FIR04-00045
| INSP-Sprinkler Rough-in | 2/18/2004 | 2/18/2004 | 2/18/2004 12:00:00 AM | P | PART |
|
|
sprinkler piping roughin ok based on resubmitted plans on site. The sprinkler rough-in approval is based on the resubmitted plans being approved and matching installation. 2/18/2004 4:17:34 PM
|
FIR03-00678
| INSP-Final Inspection | 2/18/2004 | 2/18/2004 | 2/18/2004 12:00:00 AM | P | PASS |
|
|
hood suppression system operated correctly 2/18/2004 2:46:24 PM
|