ESC09-00005
| Site Preparation | 2/18/2009 | 2/18/2009 | 2/18/2009 6:49:10 PM | P | PASS |
|
|
Ron Seargent Phone.....
|
BLD09-00035
| BLD-Foundation | 2/18/2009 | 2/18/2009 | 2/18/2009 6:48:33 PM | P | PASS |
|
|
bob Phone #: ###-####
|
ESC08-00736
| Site Preparation | 2/18/2009 | 2/18/2009 | 2/18/2009 3:32:08 PM | P | FAIL |
|
|
Verbal corr. to RP..............Clean up all hard surfaces.....Need straw waddle or trench at front sidewalk area.
|
BLD08-02350
| BLD-Footing | 2/18/2009 | 2/18/2009 | 2/18/2009 3:29:04 PM | P | PASS |
|
|
paul Phone #: ###-#### Upper level footings OK'd by Engineer.......Eng at MTI approved crushed rock fill at selected locations.
|
BLD08-02130
| BLD-Final | 2/18/2009 | 2/18/2009 | 2/18/2009 3:26:35 PM | A | CANC |
|
|
Re-sched....
|
BLD08-01335
| BLD-Conference | 2/18/2009 | 2/18/2009 | 2/18/2009 10:25:04 AM | A | DONE |
|
|
|