Inspections for the day of: Wednesday, February 18, 2009.
Number of inspections: 8
Percentage of inspections complete: 88 %
Percentage of inspections not complete: 13 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD07-00142 BLD-Final2/3/20092/11/2009 A 
Darrin; Phone #: ###-####
BLD08-02221 BLD-Final2/18/20092/18/20092/20/2009 10:59:32 AMPCANC
stucco on front & back & final on esc08-00902-thanks Phone #: ###-####
BLD08-01952 BLD-Final2/17/20092/18/20092/18/2009 9:16:22 PMPNH
Dan Phone #: ###-####
BLD08-00818 BLD-Framing/Rough-in2/18/20092/18/20092/18/2009 4:21:10 PMPPASS
Rod Phone #: ###-####
BLD08-00818 BLD-Conference2/18/20092/18/20092/18/2009 4:20:53 PMPPASS
Rod Phone #: ###-####
upper new area does not meet headroom,, contractor said that by final it will be noted on reviewed plans as only un inhabital space only,, storage,, also 2 windows will be temperd that are w/in 24" of the door
BLD08-01436 BLD-Framing/Rough-in2/17/20092/18/20092/18/2009 4:16:56 PMAPART
vladimir Phone #: ###-####
ok to sheetrock main area,, downstairs basement area needs to be rocked for occupancy seperation,, U-- R3
BLD08-02272 BLD-Framing/Rough-in2/17/20092/18/20092/18/2009 3:36:13 PMAPASS
Eddy- call 30 mins prior to going Phone #: ###-####
ok to insulate,, ok to cover interior walls w/out insulation
BLD09-00037 BLD-Conference2/17/20092/18/20092/18/2009 2:58:48 PMAPART
ed Phone #: ###-####
conf on frame