BLD09-00177
| FIRE-Final Inspection | 2/18/2009 | 2/18/2009 | 2/18/2009 4:26:29 PM | P | PART |
|
|
A temporary occupancy was given for the fire side. See the correction notice for items needing addressed.
|
FIR09-00031
| INSP-Sprinkler Rough-in | 2/18/2009 | 2/18/2009 | 2/18/2009 4:25:00 PM | P | PASS |
|
|
The rough-in inspection passed. Another rough-in inspection will be needed when the pendants have actually been placed in the t-bar grid which has not been installed yet. There is a pipe size descrepancy at the base of the new pre-action riser that needs clarified prior to final.
|
FIR08-00853
| INSP-Final Inspection | 2/18/2009 | 2/18/2009 | 2/18/2009 1:57:11 PM | P | PASS |
|
|
permit finaled
|
FIR08-00491
| INSP-Sprinkler Rough-in/Hydro | 2/17/2009 | 2/18/2009 | 2/18/2009 1:53:39 PM | P | PASS |
|
|
The above ground hydo test for the new east addition passed.
|
BLD08-02169
| FIRE-Final Inspection | 2/18/2009 | 2/18/2009 | 2/18/2009 11:07:02 AM | A | FAIL |
|
|
See the city approved plans for locations of the deficiencies that include non-approved door hardware, inoperative exit signs and emergency lights. None of the exit discharge lights appear to have been installed. Also the new fire door fusible links have not been installed as per NFPA 80 and the door has not been tested/witnessed by the fire inspector.
|
FIR07-01031
| INSP-Final Inspection | 2/17/2009 | 2/18/2009 | 2/18/2009 11:04:40 AM | P | PART |
|
|
The north and south ends of the ILF are finished
|
BLD07-01834
| FIRE-Final Inspection | 2/17/2009 | 2/18/2009 | 2/18/2009 11:03:30 AM | P | PART |
|
|
The north and south ends of the ILF have passed the life safety inspection.
|
FIR07-01032
| INSP-Final Inspection | 2/17/2009 | 2/18/2009 | 2/18/2009 11:02:31 AM | A | PART |
|
|
The north and south ends of the ILF are finished.
|
BLD08-01900
| FIRE-Final Inspection | 2/18/2009 | 2/18/2009 | 2/18/2009 7:21:25 AM | P | PASS |
|
|
Life safety passed. Contact mark senteno for agreement for insulation upgrade.
|