Inspections for the day of: Wednesday, February 18, 2009.
Number of inspections: 24
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS08-00129 MIS-Aging Inspection2/18/20092/18/20092/19/2009 4:03:13 PM CANC
ESC08-00889 Tracking Control2/18/20092/18/20092/18/2009 4:11:04 PMPPART
track out is minimal, contractor is sweeping as needed and on daily basis.
BLD08-02197 BLD-Framing/Rough-in2/18/20092/18/20092/18/2009 4:09:54 PMPPASS
Jim Phone #: ###-####. 2nd. floor, 2nd layer, both sides type x rock for 2hr. wall.
ESC08-00890 Tracking Control2/18/20092/18/20092/18/2009 4:08:20 PMPPART
Track out is minimal, contractor is sweeping on daily basis and as needed.
BLD08-02198 BLD-Framing/Rough-in2/18/20092/18/20092/18/2009 4:07:19 PMPPASS
Jim Phone #: ###-####. 2nd. floor, 2nd. layer, both sides type x rock for 2hr. wall.
ESC08-00892 Tracking Control2/18/20092/18/20092/18/2009 4:06:30 PMPPART
trackout is minimal, contractor is sweeping on a daily basis and as needed.
BLD08-02199 BLD-Framing/Rough-in2/18/20092/18/20092/18/2009 4:04:41 PMPPASS
Jim Phone #: ###-####. 2nd floor, 2nd layer, both sides type x rock for 2hr. wall.
ESC08-00894 Tracking Control2/18/20092/18/20092/18/2009 4:03:48 PMPPART
Track out is minimal, contractor is sweeping on daily basis and as needed.
BLD08-02200 BLD-Framing/Rough-in2/18/20092/18/20092/18/2009 4:02:46 PMPPASS
Jim Phone #: ###-####. 2nd. floor, 2nd layer, both sides 5/8 type x rock for 2hr. wall.
ESC08-00899 Tracking Control2/18/20092/18/20092/18/2009 2:59:47 PMPPART
Track out is minmal, contractor is sweeping on daily basis and as needed.
BLD08-02205 BLD-Framing/Rough-in2/18/20092/18/20092/18/2009 2:58:50 PMPPASS
Jim Phone #: ###-####. 2nd floor, 2nd layer, both sides type x rock for 2hr. wall.
ESC08-00900 Tracking Control2/18/20092/18/20092/18/2009 2:58:00 PMPPART
Trackout is minimal, contractor is sweeping daily and as needed.
BLD08-02206 BLD-Framing/Rough-in2/18/20092/18/20092/18/2009 2:57:09 PMPPASS
Jim Phone #: ###-####. 2nd floor, 2nd layer, both sides type x rock for 2hr. wall.
ESC08-00901 Tracking Control2/18/20092/18/20092/18/2009 2:55:34 PMPPART
Trackout is minimal, contractor is sweeping on a daily basis and as needed.
BLD08-02207 BLD-Framing/Rough-in2/18/20092/18/20092/18/2009 2:54:10 PMPPASS
Jim Phone #: ###-####. 2nd. floor, 2nd. layer, both sides, type x rock for 2hr. wall, also 1st. layer from ceiling to roof deck.
ESC08-00895 Tracking Control2/18/20092/18/20092/18/2009 2:52:43 PMPPART
Trackout is minimal, contracotr is sweeping as needed and daily.
BLD08-02201 BLD-Framing/Rough-in2/18/20092/18/20092/18/2009 2:51:42 PMPPASS
Jim Phone #: ###-####. 1st. floor, 2nd. layer, both sides 5'8 type x rock for 2hr. wall.
ESC08-00896 Tracking Control2/18/20092/18/20092/18/2009 2:50:46 PMPPART
Trackout is minimal, contractor is sweeping as needed and daily.
BLD08-02202 BLD-Framing/Rough-in2/18/20092/18/20092/18/2009 2:48:00 PMPPASS
Jim Phone #: ###-####. 1st. floor, 2nd. layer, both sides type x rock for 2hr. wall.
ESC08-00897 Tracking Control2/18/20092/18/20092/18/2009 2:47:02 PMPPART
Trackout is minimal, contractor is sweeping as needed and on daily basis.
BLD08-02203 BLD-Framing/Rough-in2/18/20092/18/20092/18/2009 2:46:23 PMPPASS
Jim Phone #: ###-####. 1st.floor, 2ndlayer, both sides type x rock for 2hr. wall.
ESC08-00898 Tracking Control2/18/20092/18/20092/18/2009 2:41:57 PMPPART
Trackout kept to a minimum. Contractor is sweeping as needed and daily.
BLD08-02204 BLD-Framing/Rough-in2/18/20092/18/20092/18/2009 2:41:05 PMPPASS
Jim Phone #: ###-####. 1st. floor, 2nd. layer, both sides, type x rockfor 2hr. wall.
BLD08-02019 DOC-Permit Expired2/18/20092/18/20092/18/2009 12:00:00 AM DONE
Permit expired by limitations.