Inspections for the day of: Thursday, February 18, 2010.
Number of inspections: 8
Percentage of inspections complete: 88 %
Percentage of inspections not complete: 13 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD09-00887 FIRE-Conference2/16/20102/16/2010 P 
Don H. Phone #: ###-####
FIR10-00064 INSP-Final Inspection2/18/20102/18/20102/18/2010 4:01:55 PMPPASS
Fire sprinkler work passed both rough-in and final inspections, permit finaled.
BLD09-00287 FIRE-Conference2/18/20102/18/20102/18/2010 4:00:29 PMPDONE
Regarding exit discharge lighting levels at the east side of the building.
BLD09-01977 FIRE-Final Inspection2/18/20102/18/20102/18/2010 3:59:10 PMAPASS
C/N items completed.
FIR10-00010 INSP-Final Inspection2/17/20102/18/20102/18/2010 3:57:57 PMAPART
Fire alarm work tested satisfactory, final pending replacement of overdue batteries at the FACP.
FIR10-00008 INSP-Final Inspection2/17/20102/18/20102/18/2010 3:50:56 PMAFAIL
Operation of the tamper switch at a riser control valve did not report offsite, also noted inconsistency between items tested and signals recieved.
FIR10-00041 INSP-Sprinkler Rough-in2/17/20102/18/20102/18/2010 3:45:17 PMAPART
Fire sprinkler work per the permit scope passed rough-in inspection and is approved for cover at the drop ceiling.
FIR10-00056 INSP-Sprinkler Rough-in2/17/20102/18/20102/18/2010 3:43:36 PMAPART
Overhead fire sprinkler modifications are okay for cover at the drop ceilings within the tenant remodel area.