Inspections for the day of: Thursday, February 18, 2010.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR09-00638 FIR-Aging Inspection2/18/20102/18/20102/26/2010 4:02:56 PM NR
work is in progress
BLD09-02109 FIRE-Conference2/17/20102/18/20102/18/2010 4:04:06 PMADONE
Discussed the locations of several exit signs in relation to sprinkler pendants.
FIR09-00707 INSP-Sprinkler Rough-in2/18/20102/18/20102/18/2010 3:48:16 PMPCANC
Cancelled due to time constraints. Rescheduled with John Phone #: ###-#### for tomorrow morning.
FIR09-00641 INSP-Final Inspection2/18/20102/18/20102/18/2010 3:20:45 PMPFAIL
The FACP panel, phone line troubles, battery troubles, type 1 hood suppression system interconnection and the interconnections with the new fire alarm system passed. Also passed were the system smoke detectors located in the central wing. The system smoke detectors in the west wing did not function correctly due to one detector being smoked in a room activated the sounder base in a room across the hall. I let Micheal know that resubmittals will be required showing the additional door magnet interconnections.
FIR09-00440 INSP-Final Inspection2/18/20102/18/20102/18/2010 3:17:38 PMPFAIL
Due to time constraits I was unable to complete the entire inspection. The forward flush passed as well as the fire alarm interconnections. Verification of ceiling installation, canopy installation and any possible blocked heads due to light fixtures still needs to be completed.
FIR10-00047 INSP-Sprinkler Rough-in2/18/20102/18/20102/18/2010 3:15:43 PMPPASS
Phase I sprinkler piping ok to cover.
FIR10-00050 INSP-Final Inspection2/17/20102/18/20102/18/2010 12:26:46 PMAFAIL
Permit will be ready for a final when the ceiling tile has been installed. Sprinkler piping is ok for cover. I noted that there is another area not shown on the plans that is under construction where sprinkler modifications will be required. Todd was to follow up on this work.
FIR09-00708 INSP-Sprinkler Rough-in2/17/20102/18/20102/18/2010 12:25:06 PMAPASS
See the city approved plans marked with todays date for partial rough-in inspections on the last wet and dry systems.
FIR09-00708 INSP-Sprinkler Rough-in/Hydro2/17/20102/18/20102/18/2010 12:23:59 PMAFAIL
The last wet and dry system overhead hydro tests failed. There was visable leakage on the dry system.
BLD10-00035 FIRE-Final Inspection2/17/20102/18/20102/18/2010 9:19:09 AMAPASS
life safety passed
BLD09-02009 FIRE-Final Inspection2/17/20102/18/20102/17/2010 3:15:12 PMAPART
A temporary occupancy is being given with Scott Arellano's permission until the fire alarm quick permit is issued and finaled and the three missing doors/hardware are installed.