GCB13-00038
| GCB-Courtesy | 2/18/2014 | 2/18/2014 | 2/19/2014 12:33:36 PM | P | PASS |
|
|
Mark ###-#### Rebar on trash enclosure
|
BLD13-01248
| BLD-Final | 2/18/2014 | 2/18/2014 | 2/18/2014 4:56:43 PM | P | NR |
|
|
Travis Phone #: ###-#### Need Mech final.
|
BLD13-01243
| BLD-Footing | 2/18/2014 | 2/18/2014 | 2/18/2014 4:54:55 PM | P | PASS |
|
|
building is on the South end // Travis Phone #: ###-####
|
BLD13-01245
| BLD-Footing | 2/18/2014 | 2/18/2014 | 2/18/2014 4:32:09 PM | P | PASS |
|
|
the building is on the South end // Travis Phone #: ###-####
|
BLD13-01753
| BLD-Final | 2/17/2014 | 2/18/2014 | 2/18/2014 4:31:19 PM | A | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Laurie Hoelscher
|
BLD13-01753
| DOC - Permit Finaled | 2/18/2014 | 2/18/2014 | 2/18/2014 4:31:07 PM | P | PASS |
|
|
|
GCB13-00159
| GCB-Footing | 2/18/2014 | 2/18/2014 | 2/18/2014 4:28:33 PM | P | PASS |
|
|
Andy ###-####
|
GCB13-00130
| GCB-Framing | 2/14/2014 | 2/18/2014 | 2/18/2014 3:37:35 PM | A | NR |
|
|
Blake ###-#### mech r/i passed 2/14 Need to create an opening between living area at main floor to stairway area (main floor).
|
GCB13-00146
| GCB-Final | 2/14/2014 | 2/18/2014 | 2/18/2014 2:51:06 PM | P | FAIL |
|
|
Pete ###-#### call for access Need verification of approval Foam seal or Blower door test.
|
GCB12-00157
| GCB-Final | 2/14/2014 | 2/18/2014 | 2/18/2014 11:28:09 AM | A | PASS |
|
|
Larry Mahr ###-#### Structural Final ......OK.
|
GCB13-00160
| GCB-Framing | 2/14/2014 | 2/18/2014 | 2/18/2014 11:15:17 AM | A | PASS |
|
|
Grey ###-####
|