BLD15-00150
| BLD-Final | 2/13/2015 | 2/18/2015 | 2/18/2015 4:15:24 PM | P | PASS |
|
|
Adan Phone #: ###-####
|
BLD15-00150
| DOC - Permit Finaled | 2/18/2015 | 2/18/2015 | 2/18/2015 4:14:57 PM | P | PASS |
|
|
|
BLD13-03405
| BLD-Wall cover | 2/17/2015 | 2/18/2015 | 2/18/2015 3:26:20 PM | A | PASS |
|
|
Exterior shear nail off at Lobby. Phone #: ###-#### Inspection requested via web by Tim Toups to podem level ok.
|
BLD13-03405
| BLD-Framing/Rough-in | 2/17/2015 | 2/18/2015 | 2/18/2015 3:25:31 PM | A | PASS |
|
|
Framing at patio decks of tower 3 ; 5 Phone #: ###-#### Inspection requested via web by Tim Toupsdecks ok
|
BLD13-03405
| BLD-Wall cover | 2/17/2015 | 2/18/2015 | 2/18/2015 3:24:36 PM | A | PASS |
|
|
Drywall patch backs at fire dampers 5th floor tower 1 Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD13-03405
| BLD-Energy code compliance | 2/17/2015 | 2/18/2015 | 2/18/2015 3:23:40 PM | A | PASS |
|
|
3rd floor tower 2 ceiling insulation Phone #: ###-#### Inspection requested via web by Tim Toupsair seal ok
|
BLD11-01806
| BLD-Aging Inspection | 2/18/2015 | 2/18/2015 | 2/18/2015 11:56:24 AM | | DEFR |
|
|
ele pending
|
BLD14-00681
| BLD-Framing/Rough-in | 2/17/2015 | 2/18/2015 | 2/18/2015 11:55:37 AM | A | PART |
|
|
Jose-Section 1 2nd floor Phone #: ###-#### c/n posted/riser in coridor gyp ok
|
BLD14-02958
| BLD-Final | 2/17/2015 | 2/18/2015 | 2/18/2015 11:26:45 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Frederick Sand
|
BLD14-02958
| DOC - Permit Finaled | 2/18/2015 | 2/18/2015 | 2/18/2015 11:22:26 AM | P | PASS |
|
|
|