FIR14-00708
| INSP-Sprinkler Rough-in | 2/18/2015 | 2/18/2015 | 2/19/2015 4:39:35 PM | P | PART |
|
|
Rough-in inspection for the 4th floor area F living units completed.
|
BLD14-02773
| FIRE-Final Inspection | 2/18/2015 | 2/18/2015 | 2/18/2015 3:59:11 PM | P | PASS |
|
|
Fire life safety finaled.
|
FIR14-00866
| INSP-Sprinkler Rough-in | 2/13/2015 | 2/18/2015 | 2/18/2015 3:17:09 PM | A | PART |
|
|
Completed initial rough-in for the 2nd floor living units as annotated on approved plans. Items incude; missing sprinker at closet, overspaced coverage, sprinkler too close to ceiling fan, noted two unprotected concealed spaces, incorrect type of head at the janitors room.
|
FIR14-00815
| INSP-Sprinkler Rough-in | 2/17/2015 | 2/18/2015 | 2/18/2015 3:09:59 PM | A | PART |
|
|
Requesting UG/Flush inspection. Jeff C is your contact. Please call 1/2 prior to inspection. Phone #: ###-#### Inspection requested via web by Stan Beus * *UG fire supply line flush completed satisfactory* Note- UG permit work attatched to FIR14-00477.
|
FIR14-00862
| INSP-Final Inspection | 2/18/2015 | 2/18/2015 | 2/18/2015 3:05:49 PM | A | PASS |
|
|
As-built plans accepted. Modified scope of work to include the new HVAC unit and duct detector tested satisfactory. Permit finaled.
|
FIR15-00070
| INSP-Sprinkler Rough-in | 2/18/2015 | 2/18/2015 | 2/18/2015 3:04:08 PM | A | PART |
|
|
Fire sprinkler work okay for cover at the sheetrock lid ceilings. Grid ceilings and heads above the sales areas are not yet complete.
|
FIR15-00065
| INSP-Sprinkler Rough-in | 2/18/2015 | 2/18/2015 | 2/18/2015 3:01:02 PM | A | PART |
|
|
Verified adjusted coverage at the 15th floor per previous inspection notes.
|