FIR15-00892
| INSP-Sprinkler Rough-in | 2/18/2016 | 2/18/2016 | 2/18/2016 2:55:26 PM | P | PASS |
|
|
insulation in attic space above main roof structure has been verified.
|
FIR15-00773
| INSP-Final Inspection | 2/18/2016 | 2/18/2016 | 2/18/2016 2:22:54 PM | P | PASS |
|
|
Permit finaled
|
BLD15-04449
| FIRE-Final Inspection | 2/18/2016 | 2/18/2016 | 2/18/2016 1:45:01 PM | P | FAIL |
|
|
Plan modification is needed showing the old projector mezzanine and its access, provide emergency lighting over Sales Floor, provide single action hardware on the two dressing rooms, provide additional fire extinguisher in the south east corner of the Sales Floor, replace all of the painted heads in the Storage Area, mount the fire extinguisher in the Storage Area, provide a demo permit for the single horn/strobe in the Storage Area, remove the padlock hasp at the door near the Dressing Rooms, replace ceiling tile in Office.
|
FIR15-00757
| INSP-Final Inspection | 2/17/2016 | 2/18/2016 | 2/18/2016 1:29:23 PM | A | PASS |
|
|
permit finaled
|
FIR15-00517
| INSP-Sprinkler Rough-in/Hydro | 2/17/2016 | 2/18/2016 | 2/18/2016 11:40:59 AM | A | PASS |
|
|
Overhead hydro test passed
|
BLD15-00241
| FIRE-Final Inspection | 2/18/2016 | 2/18/2016 | 2/18/2016 11:12:47 AM | P | PASS |
|
|
life safety passed
|
BLD15-00244
| FIRE-Final Inspection | 2/18/2016 | 2/18/2016 | 2/18/2016 11:11:37 AM | P | PASS |
|
|
life safety passed
|
FIR15-00548
| INSP-Final Inspection | 2/18/2016 | 2/18/2016 | 2/18/2016 11:10:55 AM | P | PASS |
|
|
Permit finaled
|
FIR15-00552
| INSP-Final Inspection | 2/18/2016 | 2/18/2016 | 2/18/2016 11:08:58 AM | P | PASS |
|
|
Permit finaled
|
FIR15-00873
| INSP-Final Inspection | 2/18/2016 | 2/18/2016 | 2/18/2016 9:54:15 AM | P | PASS |
|
|
Permit finaled
|
FIR16-00062
| INSP-Final Inspection | 2/18/2016 | 2/18/2016 | 2/18/2016 9:53:37 AM | P | PASS |
|
|
Permit finaled
|
FIR15-00666
| INSP-Final Inspection | 2/12/2016 | 2/18/2016 | 2/18/2016 9:53:13 AM | A | PASS |
|
|
Permit finaled
|
FIR15-00663
| INSP-Final Inspection | 2/12/2016 | 2/18/2016 | 2/18/2016 9:52:22 AM | A | PASS |
|
|
Permit finaled
|
BLD15-03027
| FIRE-Final Inspection | 2/17/2016 | 2/18/2016 | 2/18/2016 9:51:32 AM | A | PASS |
|
|
Life safety passed. Per plan review the exit signs and emergency lights shown on the plans are not required. Contractor did not install.
|
FIR15-00665
| INSP-Sprinkler Rough-in/Hydro | 2/15/2016 | 2/18/2016 | 2/18/2016 9:50:27 AM | A | CANC |
|
|
Matt is the contact. Thanks. Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR15-00555
| INSP-Supply line flush | 2/15/2016 | 2/18/2016 | 2/18/2016 9:48:23 AM | A | PASS |
|
|
Underground supply line flush passed
|
BLD15-03813
| FIRE-Final Inspection | 2/17/2016 | 2/18/2016 | 2/18/2016 8:37:28 AM | A | PASS |
|
|
Life safety passed. Contractor to provide automatic flush bolts on the double exit door and single action hardware on the north exit door prior to a building inspection as per conversation.
|
FIR16-00068
| INSP-Final Inspection | 2/17/2016 | 2/18/2016 | 2/18/2016 8:15:30 AM | P | PASS |
|
|
Permit finaled
|
FIR16-00091
| INSP-Final Inspection | 2/17/2016 | 2/18/2016 | 2/18/2016 8:14:14 AM | A | PASS |
|
|
Permit finaled
|
FIR16-00068
| INSP-Final Inspection | 2/18/2016 | 2/18/2016 | 2/18/2016 7:07:25 AM | A | CANC |
|
|
jeff packham Phone #: ###-#### >> Inspection requested via web by Brodie Stenquist Inspection cancelled from web by: Jeff Packham
|