MIS19-00114
| MIS-Aging Inspection | 2/18/2020 | 2/18/2020 | 2/19/2020 7:12:24 AM | | DONE |
|
|
|
MIS18-00406
| MIS-Aging Inspection | 2/18/2020 | 2/18/2020 | 2/19/2020 7:10:47 AM | | DONE |
|
|
|
BLD20-00130
| BLD-Framing/Rough-in | 2/18/2020 | 2/18/2020 | 2/18/2020 3:39:01 PM | P | PASS |
|
|
Matt Phone #: ###-####//walls only ok to cover//
|
BLD19-03843
| BLD-Final | 2/14/2020 | 2/18/2020 | 2/18/2020 3:38:30 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Brian Keeley//corrections made//
|
BLD19-03843
| DOC - Permit Finaled | 2/18/2020 | 2/18/2020 | 2/18/2020 3:38:13 PM | P | PASS |
|
|
|
BLD19-04013
| BLD-Framing/Rough-in | 2/18/2020 | 2/18/2020 | 2/18/2020 3:03:20 PM | P | FAIL |
|
|
Pat - Sheer Wall Inspection Phone #: ###-####//interior fire walls and shear walls--do not meet specifications on plans for UL assembly and sound//discussed with contractor UL assembly per plans and shear walls per structurals//
|
BLD20-00149
| BLD-Foundation | 2/18/2020 | 2/18/2020 | 2/18/2020 2:10:02 PM | P | FAIL |
|
|
does not appear to meet 10' setback in rear//measures roughly 8'//let contractor know//
|
BLD20-00149
| BLD-Footing | 2/17/2020 | 2/18/2020 | 2/18/2020 2:09:14 PM | P | DEFR |
|
|
Phone #: 2089109404 >> Inspection requested via mobile web by Ricardo aggregate constru//footing was poured without inspection//contractor assumes liability//rear setback minimum shows 10' measured onsite ins roughly 8'//
|
BLD20-00032
| BLD-Foundation | 2/18/2020 | 2/18/2020 | 2/18/2020 1:33:20 PM | P | FAIL |
|
|
Jimmy Phone #: ###-####//setbacks ok per plans//still need 24 inch frost depth//ground is frozen in some locations//
|
BLD19-00534
| BLD-Other | 2/17/2020 | 2/18/2020 | 2/18/2020 12:18:37 PM | A | PART |
|
|
Exterior sheetrock inspection to install weather barrier Phone #: ###-#### Inspection requested via web by Travis Blackburn//ok per pla ns//
|
BLD19-00535
| BLD-Wall Bracing | 2/17/2020 | 2/18/2020 | 2/18/2020 12:17:47 PM | A | PART |
|
|
Shear nail and hardware to install weather barrier, windows and soffit and fascia Phone #: ###-#### Inspection requested via web by Travis Blackburn//exterior nailing and strapping ok//
|
BLD20-00487
| BLD-Framing/Rough-in | 2/14/2020 | 2/18/2020 | 2/18/2020 11:21:23 AM | A | FAIL |
|
|
Angela Phone #: ###-####//CN posted onsite with permit//will need to open the chase to view the framing//mechanical will also need to verify clearances and requirements//
|
BLD19-03992
| BLD-Wall Bracing | 2/14/2020 | 2/18/2020 | 2/18/2020 10:31:56 AM | A | PASS |
|
|
shear // Willie Phone #: ###-####
|
BLD19-03209
| BLD-Final | 2/14/2020 | 2/18/2020 | 2/18/2020 10:12:39 AM | A | CANC |
|
|
Tom Phone #: ###-####//cancel per Tom//
|
BLD19-02018
| BLD-Final | 2/14/2020 | 2/18/2020 | 2/18/2020 10:10:24 AM | A | PART |
|
|
Elton Phone #: ###-####//treads and widths ok//need to return the handrails//add smoke CO detectors per plans//call for final//
|
BLD19-02017
| BLD-Final | 2/14/2020 | 2/18/2020 | 2/18/2020 10:10:06 AM | A | PART |
|
|
Elton Phone #: ###-####//treads and widths ok//need to return the handrails//add smoke CO detectors per plans//call for final//
|
BLD19-03701
| BLD-Framing/Rough-in | 2/14/2020 | 2/18/2020 | 2/18/2020 9:24:06 AM | A | PART |
|
|
Mark- please call for access Phone #: ###-####//still needs header at stairs over mechanical on exterior wall//ok to insulate house and garage//steps, deck etc has several code issues, went over onsite//
|
MIS19-00112
| MIS-Aging Inspection | 2/18/2020 | 2/18/2020 | 2/18/2020 8:26:54 AM | | DONE |
|
|
|
MIS19-00112
| DOC - Permit Finaled | 2/18/2020 | 2/18/2020 | 2/18/2020 8:26:37 AM | P | PASS |
|
|
per Jim Sly ""Appears shed being built is less than 200 sq ft."" see previous inspection
|