Inspections for the day of: Tuesday, February 19, 2002.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-02145 BLD-Final2/14/20022/19/20022/20/2002 12:00:00 AMAPART
fn occ- russ -###-####; struct final ok, pending letter from Idaho Power. (Work is at Sub-station) 2/21/2002 8:56:29 AM
BLD00-01649 BLD-Final2/15/20022/19/20022/20/2002 12:00:00 AMANR
###-####; Keep c/n, foyer stairs are complete. 2/21/2002 8:57:30 AM
BLD00-01649 BLD-Conference2/19/20022/19/20022/20/2002 12:00:00 AMAPASS
Scheduled by Inspector: 408 On 2/19/2002 5:08:18 PM w/ Mel Perez re 1hr ext walls...will consult supervisor. 2/21/2002 9:00:11 AM
BLD01-02393 BLD-Final2/15/20022/19/20022/19/2002 12:00:00 AMAFAIL
###-#### JASON; keep c/n, install all stair rails & landings, ext. finish grade , etc. Verify all other "trade" finals prior to reinspection, or fee may be assessed. 2/19/2002 1:25:23 PM
BLD01-00602 BLD-Wall cover2/18/20022/19/20022/19/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 02/18/2002 at 08:36:59. Contact: ###-####. Complete c/n: firestops at elec boxes on tenant walls, draft stops; chk stairs at final; ok to cover int. shear walls for reinspect. 2/19/2002 1:36:35 PM
BLD01-00609 BLD-Wall cover2/18/20022/19/20022/19/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 02/18/2002 at 08:38:26. Contact: ###-####. Complete c/n: fireblocks, draft stops, boxes back to back at 1hr. wall, stairs. Int. shear walls ok to cover for reinsp. 2/19/2002 1:31:31 PM
MEC02-00391 Rough-in2/18/20022/19/20022/19/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 02/18/2002 at 17:10:14. Contact: ###-####. verify combustion air at furnace, keep ducts clear from recessed lites, add csst plate protectors at fireplace area. 2/19/2002 1:42:40 PM
MEC02-00391 Pressure Test2/18/20022/19/20022/19/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 02/18/2002 at 17:10:37. Contact: ###-####...repressurize, recall, need 20# test. 2/19/2002 1:43:25 PM
BLD01-00601 BLD-Framing/Rough-in2/18/20022/19/20022/19/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 02/18/2002 at 18:25:32. Contact: ###-####. C/n, complete fireblocks, nail protectors, repair overbored or cut studs at wet walls, seal draft stops per UBC 708; add firestop pads at elec . boxes w/i 24" on tenant separation walls per 709. Stairs to be completed...check at final w/ rails. 2/19/2002 1:29:42 PM
BLD01-01920 BLD-Framing/Rough-in2/19/20022/19/20022/19/2002 12:00:00 AMPPASS
###-#### c/n ok. 2/21/2002 9:12:44 AM
BLD01-01920 BLD-Energy code compliance2/19/20022/19/20022/19/2002 12:00:00 AMPPASS
###-#### ROCKO; ok to cover.
2/21/2002 9:13:44 AM
BLD01-01434 BLD-Final2/19/20022/19/20022/19/2002 12:00:00 AMPPASS
###-#### digital pager has to be CARL D.c/n ok; ok for occupancy. 2/21/2002 9:05:13 AM
BLD01-02025 BLD-Framing/Rough-in2/19/20022/19/20022/19/2002 12:00:00 AMPFAIL
shear inspection ###-####; complete fireblocking, add int. side shear panels as needed. 2/21/2002 9:10:16 AM
BLD01-03206 BLD-Energy code compliance2/18/20022/19/20022/19/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 02/18/2002 at 08:02:37. Contact: ###-####...walls ok, chk. attic & crawl at final 2/21/2002 9:11:52 AM
BLD01-03203 BLD-Framing/Rough-in2/18/20022/19/20022/19/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 02/18/2002 at 08:04:43. Contact: ###-####. ok to insulate. 2/21/2002 9:12:19 AM