BLD02-00111
| BLD-Framing/Rough-in | 2/15/2002 | 2/19/2002 | 2/19/2002 12:00:00 AM | A | PART |
|
|
JOHN ###-#### PLEASE CALL BEFORE GOING OUTrest room ok ceiling needs patches in place prior to 2nd layer 5/8" drywall. 2/19/2002 11:00:37 AM
|
BLD02-00157
| BLD-Energy code compliance | 2/18/2002 | 2/19/2002 | 2/19/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 02/18/2002 at 09:27:39. Contact: ###-####.
|
BLD02-00099
| BLD-Concrete | 2/18/2002 | 2/19/2002 | 2/19/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 02/18/2002 at 10:09:11. Contact: ###-####.Poured appears ok ,went over special inspection requirements for epoxy bolts. 2/19/2002 11:31:04 AM
|
BLD01-02064
| BLD-Wall cover | 2/18/2002 | 2/19/2002 | 2/19/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 02/18/2002 at 11:28:20. Contact: ###-####.drywall above ceiling ok grid ceiling needs all pereimeters. 2/19/2002 11:44:56 AM
|
BLD01-03049
| BLD-Footing | 2/18/2002 | 2/19/2002 | 2/19/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 02/18/2002 at 11:51:55. Contact: ###-####. steps. 2/19/2002 12:15:41 PM
|
BLD01-03049
| BLD-Conference | 2/18/2002 | 2/19/2002 | 2/19/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 02/18/2002 at 11:52:42. Contact: ###-####.
|
BLD01-03201
| BLD-Final | 2/18/2002 | 2/19/2002 | 2/19/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 02/18/2002 at 14:25:56. Contact: ###-####. ok perm oc. 2/19/2002 11:32:15 AM
|
BLD99-03216
| BLD-Footing | 2/18/2002 | 2/19/2002 | 2/19/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/18/2002 at 15:04:10. Contact: .Special inspection required by plans and footing for ramp shown to be 20 In wide has been constructed as 14 in , a c/n is posted owner and foundation contractor on site, Along with concrete truck, Note I received a call from foundation contractor this morning and he indicated to please make him my last stop as he would not be ready untill 12:00. Note Inspection done at this time also. 2/19/2002 1:00:48 PM
|
BLD01-00729
| BLD-Framing/Rough-in | 2/18/2002 | 2/19/2002 | 2/19/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 02/18/2002 at 17:24:40. Contact: .3rd floor need fire stoping at 3 rest room walls/ will recall. 2/19/2002 2:42:59 PM
|
MEC01-03679
| Rough-in | 2/19/2002 | 2/19/2002 | 2/19/2002 12:00:00 AM | P | NH |
|
|
merle ###-####Locked out tried at rear and front. 2/19/2002 2:36:40 PM
|
BLD02-00035
| BLD-Framing/Rough-in | 2/19/2002 | 2/19/2002 | 2/19/2002 12:00:00 AM | P | PASS |
|
|
shear nailing
|
BLD02-00100
| BLD-Framing/Rough-in | 2/19/2002 | 2/19/2002 | 2/19/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 02/19/2002 at 09:30:45. Contact: ###-####. ok subject to other inspections. 2/19/2002 3:23:32 PM
|
BLD02-00280
| BLD-Footing | 2/19/2002 | 2/19/2002 | 2/19/2002 12:00:00 AM | P | FAIL |
|
|
###-#### jack . NO plans at the site. Posted a c/n. 2/19/2002 4:07:57 PM 2/19/2002 4:08:10 PM
|
BLD02-00227
| BLD-Footing | 2/19/2002 | 2/19/2002 | 2/19/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 02/19/2002 at 10:18:05. Contact: ###-####.
|
BLD01-00736
| BLD-Framing/Rough-in | 2/19/2002 | 2/19/2002 | 2/19/2002 12:00:00 AM | P | PART |
|
|
Scheduled by Inspector: 407 On 2/19/2002 2:41:10 PM
|
BLD01-00737
| BLD-Framing/Rough-in | 2/19/2002 | 2/19/2002 | 2/19/2002 12:00:00 AM | P | PART |
|
|
Scheduled by Inspector: 407 On 2/19/2002 2:42:18 PM
|