Inspections for the day of: Tuesday, February 19, 2002.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-00111 BLD-Framing/Rough-in2/15/20022/19/20022/19/2002 12:00:00 AMAPART
JOHN ###-#### PLEASE CALL BEFORE GOING OUTrest room ok ceiling needs patches in place prior to 2nd layer 5/8" drywall. 2/19/2002 11:00:37 AM
BLD02-00157 BLD-Energy code compliance2/18/20022/19/20022/19/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 02/18/2002 at 09:27:39. Contact: ###-####.
BLD02-00099 BLD-Concrete2/18/20022/19/20022/19/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 02/18/2002 at 10:09:11. Contact: ###-####.Poured appears ok ,went over special inspection requirements for epoxy bolts. 2/19/2002 11:31:04 AM
BLD01-02064 BLD-Wall cover2/18/20022/19/20022/19/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 02/18/2002 at 11:28:20. Contact: ###-####.drywall above ceiling ok grid ceiling needs all pereimeters. 2/19/2002 11:44:56 AM
BLD01-03049 BLD-Footing2/18/20022/19/20022/19/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 02/18/2002 at 11:51:55. Contact: ###-####. steps. 2/19/2002 12:15:41 PM
BLD01-03049 BLD-Conference2/18/20022/19/20022/19/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 02/18/2002 at 11:52:42. Contact: ###-####.
BLD01-03201 BLD-Final2/18/20022/19/20022/19/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 02/18/2002 at 14:25:56. Contact: ###-####. ok perm oc. 2/19/2002 11:32:15 AM
BLD99-03216 BLD-Footing2/18/20022/19/20022/19/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 02/18/2002 at 15:04:10. Contact: .Special inspection required by plans and footing for ramp shown to be 20 In wide has been constructed as 14 in , a c/n is posted owner and foundation contractor on site, Along with concrete truck, Note I received a call from foundation contractor this morning and he indicated to please make him my last stop as he would not be ready untill 12:00. Note Inspection done at this time also. 2/19/2002 1:00:48 PM
BLD01-00729 BLD-Framing/Rough-in2/18/20022/19/20022/19/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 02/18/2002 at 17:24:40. Contact: .3rd floor need fire stoping at 3 rest room walls/ will recall. 2/19/2002 2:42:59 PM
MEC01-03679 Rough-in2/19/20022/19/20022/19/2002 12:00:00 AMPNH
merle ###-####Locked out tried at rear and front. 2/19/2002 2:36:40 PM
BLD02-00035 BLD-Framing/Rough-in2/19/20022/19/20022/19/2002 12:00:00 AMPPASS
shear nailing
BLD02-00100 BLD-Framing/Rough-in2/19/20022/19/20022/19/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 02/19/2002 at 09:30:45. Contact: ###-####. ok subject to other inspections. 2/19/2002 3:23:32 PM
BLD02-00280 BLD-Footing2/19/20022/19/20022/19/2002 12:00:00 AMPFAIL
###-#### jack . NO plans at the site. Posted a c/n. 2/19/2002 4:07:57 PM 2/19/2002 4:08:10 PM
BLD02-00227 BLD-Footing2/19/20022/19/20022/19/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 02/19/2002 at 10:18:05. Contact: ###-####.
BLD01-00736 BLD-Framing/Rough-in2/19/20022/19/20022/19/2002 12:00:00 AMPPART
Scheduled by Inspector: 407 On 2/19/2002 2:41:10 PM
BLD01-00737 BLD-Framing/Rough-in2/19/20022/19/20022/19/2002 12:00:00 AMPPART
Scheduled by Inspector: 407 On 2/19/2002 2:42:18 PM