BLD01-02724
| FIRE-Final Inspection | 2/18/2002 | 2/19/2002 | 2/19/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/18/2002 at 12:35:44. Contact: ###-####. occupant load sign; door hardware removed and sign; 2/19/2002 9:23:48 AM
|
BLD01-02775
| FIRE-Final Inspection | 2/15/2002 | 2/19/2002 | 2/19/2002 12:00:00 AM | A | NR |
|
|
MIKE ###-#### rescheduled for 2/20/02 2/19/2002 9:24:18 AM
|
BLD01-00234
| FIRE-Conference | 2/15/2002 | 2/19/2002 | 2/19/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/15/2002 at 13:40:37. Contact: ###-####. tested alarms; got to the third floor; need detectors at exhaust dampers on 4th floor; NAC on 4th floor not reporting battery loss trouble 2/19/2002 4:25:46 PM
|
FIR01-00323
| INSP-Sprinkler Rough-in/Hydro | 2/18/2002 | 2/19/2002 | 2/19/2002 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 02/18/2002 at 15:15:40. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 02/19/2002 at 09:23:38.
|
BLD01-02955
| FIRE-Final Inspection | 2/19/2002 | 2/19/2002 | 2/19/2002 12:00:00 AM | P | FAIL |
|
|
early pm ###-#### call to meet there need exit signs for second exit and hang extinguisher 2/19/2002 1:14:34 PM
|
FIR01-00435
| INSP-Alarm Testing | 2/19/2002 | 2/19/2002 | 2/19/2002 12:00:00 AM | P | FAIL |
|
|
Added by Inspector: 409 On 2/19/2002 4:24:10 PM 4th floor NAC not reporting batery loss trouble; need detectors at 4th floor exhaust dampers
|