FIR01-00512
| INSP-Final Inspection | 2/14/2002 | 2/19/2002 | 2/19/2002 12:00:00 AM | A | FAIL |
|
|
Contractor to verify batteries are correctly sized in NAC panels (current draw exceeded plans), NAC panels not reporting loss of AC, NAC panel AC is not hardwired (verify requirement) 2/19/2002 1:26:25 PM
|
FIR01-00587
| INSP-Final Inspection | 2/14/2002 | 2/19/2002 | 2/19/2002 12:00:00 AM | A | NR |
|
|
Sprinkler system was not complete, fire alarm contractor did not have approved plans on site 2/19/2002 1:23:13 PM
|
MIS02-00027
| FIR-Final | 2/15/2002 | 2/19/2002 | 2/19/2002 12:00:00 AM | A | FAIL |
|
|
provide door to remain unlocked sticker on office exit, provide address for building either on building or sign at street, provide fire extinguishers as discussed 2/19/2002 3:18:05 PM
|
MIS01-00004
| FIR-Final | 2/14/2002 | 2/19/2002 | 2/19/2002 12:00:00 AM | P | PASS |
|
|
Fire life/safety finaled 2/19/2002 4:39:26 PM
|