ELE02-02656
| ELE-Aging Inspection | 2/19/2003 | 2/19/2003 | 2/19/2003 12:00:00 AM | | PART |
|
|
contractor will schedule called
2/19/2003 7:49:33 AM
|
ELE02-02657
| ELE-Aging Inspection | 2/19/2003 | 2/19/2003 | 2/19/2003 12:00:00 AM | | PART |
|
|
contractor wil schedule called 2/19/2003 7:50:09 AM
|
ELE02-02403
| Final | 2/18/2003 | 2/19/2003 | 2/19/2003 12:00:00 AM | A | PASS |
|
|
Jack, This is the one that I talked to you about on 2/18 in the afternoon that is on Grandee St. Marv Curtis; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell ok was done already 2/19/2003 11:42:17 AM
|
ELE03-00444
| Rough-In Permanent Service | 2/18/2003 | 2/19/2003 | 2/19/2003 12:00:00 AM | A | FAIL |
|
|
Replaced the all-in-one service. Home owner's name is Lavar Wells, phone ###-####.; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell cor. posted called 110.26 (F) (1 & 2) clearence p/s and sub panel, 110.3(B) 30 amp max for a/c, B M C 4.05.10 no violations to be retained 2/19/2003 12:15:58 PM
|
ELE02-01458
| Electrical Rough-In | 2/18/2003 | 2/19/2003 | 2/19/2003 12:00:00 AM | A | PART |
|
|
partial ceiling cover; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung ok lobby inner offices and corridor 2/19/2003 9:23:32 AM
|
ELE02-03407
| Final | 2/18/2003 | 2/19/2003 | 2/19/2003 12:00:00 AM | A | CANC |
|
|
Call if you need somebody to meet you there Scott ###-#### see added r/i 2/19/2003 10:37:46 AM
|
ELE03-00425
| Rough-In Permanent Service | 2/18/2003 | 2/19/2003 | 2/19/2003 12:00:00 AM | A | FAIL |
|
|
###-#### cor. posted called 300.4 (A)(1) & (D) 314.20 outside boxes not flush, and complete wiring in kit, din. area ceiling 2/19/2003 8:50:51 AM
|
ELE02-03407
| Electrical Rough-In | 2/19/2003 | 2/19/2003 | 2/19/2003 12:00:00 AM | A | PART |
|
|
conference ok cor. 300.10 tighten locknut on flex bushing for #4 wire , use 300 volt rated phone cable and terminate phone cable with approved clamp not 90 degree flex fitting, all systems shall be complete fire alarm phone etc.
|
ELE02-02685
| Final | 2/19/2003 | 2/19/2003 | 2/19/2003 12:00:00 AM | P | CANC |
|
|
called will do it 02-20-03 AM
2/19/2003 4:57:36 PM
|
ELE03-00057
| Electrical Rough-In | 2/18/2003 | 2/19/2003 | 2/19/2003 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 2/18/2003 at 1:18:47 PM. Contact: ###-####. u/g for p/s and gen set, 4" phone, 1st floor j boxes ok 2/19/2003 1:56:47 PM
|
ELE03-00253
| Conference | 2/19/2003 | 2/19/2003 | 2/19/2003 12:00:00 AM | P | PASS |
|
|
kevin -call 1 hr before insp- re-insp; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok final ok corrections made 2/19/2003 2:15:16 PM
|
ELE03-00031
| Electrical Rough-In | 2/19/2003 | 2/19/2003 | 2/19/2003 12:00:00 AM | P | CANC |
|
|
###-#### called will do it 02-20-03 AM 2/19/2003 4:58:46 PM
|
ELE02-03244
| Electrical Rough-In | 2/19/2003 | 2/19/2003 | 2/19/2003 12:00:00 AM | P | PASS |
|
|
###-#### ceilings ok but shall use Juno # 28 or #29 trim s for boxed in non IC ,non air tight reccess light fixtures in kitchen at time of final see JF for further info 2/19/2003 4:32:27 PM
|