BLD02-02618
| FIRE-Final Inspection | 2/18/2003 | 2/19/2003 | 2/19/2003 12:00:00 AM | A | CANC |
|
|
contractor called and stated that he wasn't ready yet 2/19/2003 12:36:17 PM
|
FIR02-00467
| INSP-Final Inspection | 2/18/2003 | 2/19/2003 | 2/19/2003 12:00:00 AM | A | FAIL |
|
|
###-#### Provide knox key box per the fire dept review notes 2/19/2003 11:18:58 AM
|
FIR03-00027
| INSP-Sprinkler Rough-in | 2/18/2003 | 2/19/2003 | 2/19/2003 12:00:00 AM | P | PASS |
|
|
tyson; Phone #: ###-#### Sprinkler piping is OK to cover 2/19/2003 2:02:42 PM
|