MEC04-00453
| Pressure Test | 2/17/2004 | 2/19/2004 | 2/19/2004 12:00:00 AM | A | PASS |
|
|
###-#### ok for new gas range in kitchen. 2/18/2004 6:28:52 PM
|
BLD03-02393
| BLD-Framing/Rough-in | 2/18/2004 | 2/19/2004 | 2/19/2004 12:00:00 AM | A | FAIL |
|
|
camron ( shear nail inspection ) please call before going over.; Phone #: ###-#### Internet Inspection Request from: Darla Downs. posted c/n and called contractor. 2/18/2004 9:56:45 PM
|
BLD03-00781
| BLD-Framing/Rough-in | 2/18/2004 | 2/19/2004 | 2/19/2004 12:00:00 AM | A | PART |
|
|
Framing and insulation inspection in A wing; Phone #: ###-#### Internet Inspection Request from: Wayne Coleman Ok except need to build walls to ceiling in small storage . 2/18/2004 7:57:55 PM
|
MEC04-00008
| Final | 2/19/2004 | 2/19/2004 | 2/19/2004 12:00:00 AM | P | PASS |
|
|
Homeowner should be available. Call with any problems.; Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS
|
BLD03-02827
| BLD-Final | 2/18/2004 | 2/19/2004 | 2/19/2004 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 2/18/2004 at 1:32:58 PM. Contact: ###-####. c/n air seal ele boxes and small piece insulation in crawl fell down 2/18/2004 11:36:58 PM
|
MEC04-00466
| Final | 2/18/2004 | 2/19/2004 | 2/19/2004 12:00:00 AM | P | PASS |
|
|
Please inspect as close to 2:00p.m. as possible. Call with any problems. Thanks, April.; Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS
|