MIS07-00153
| MIS-Aging Inspection | 2/19/2008 | 2/19/2008 | 2/26/2008 4:15:15 PM | A | DONE |
|
|
I left a message on Darren's voice mail requesting status of the racking permit. I also contacted sam rogers. He is forwarding status to Jennifer and dave hanniman. I have set up a followup inspection in one week.
|
BLD06-03160
| FIRE-Conference | 2/12/2008 | 2/19/2008 | 2/21/2008 3:14:43 PM | P | PASS |
|
|
Life safety passed
|
FIR06-00011
| INSP-Alarm Testing | 2/19/2008 | 2/19/2008 | 2/19/2008 4:35:32 PM | P | CANC |
|
|
duplicate inspection
|
BLD05-01395
| FIRE-Final Inspection | 2/18/2008 | 2/19/2008 | 2/19/2008 4:13:48 PM | A | FAIL |
|
|
Provide address facing the street, provide fire lane signage as per one of the three options per the review comments and provide the fire dept. access/compact parking as per the approved plans.
|
BLD07-02145
| FIRE-Final Inspection | 2/18/2008 | 2/19/2008 | 2/19/2008 3:57:14 PM | A | PASS |
|
|
LIfe safety passed. I will verify addresses when the tenant improvements are done since each space has the potential to be a separate street address. The same for door hardware.
|
FIR07-00213
| INSP-Sprinkler Rough-in | 2/15/2008 | 2/19/2008 | 2/19/2008 11:47:27 AM | A | PASS |
|
|
The underground supply piping for building "A" is ok for cover
|
FIR08-00026
| INSP-Sprinkler Rough-in | 2/19/2008 | 2/19/2008 | 2/19/2008 11:38:49 AM | P | PASS |
|
|
The thrust block is ok to bury.
|
FIR08-00074
| INSP-Final Inspection | 2/15/2008 | 2/19/2008 | 2/19/2008 11:29:53 AM | A | PASS |
|
|
permit finaled
|
FIR07-00449
| INSP-Sprinkler Rough-in/Hydro | 2/15/2008 | 2/19/2008 | 2/19/2008 11:25:03 AM | A | FAIL |
|
|
1st floor OH Hydro test failed.
|
FIR06-00011
| INSP-Final Inspection | 2/14/2008 | 2/19/2008 | 2/19/2008 10:29:01 AM | A | FAIL |
|
|
The fire alarm system will be able to be finaled when the access control egress door to the second floor library has been decided upon.
|