Inspections for the day of: Tuesday, February 19, 2008.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD07-03188 BLD-Framing/Rough-in2/15/20082/19/20082/19/2008 4:36:29 PMPPASS
scott Phone #: ###-####. interior nonload bearing walls and hardlid only.
BLD07-03254 BLD-Framing/Rough-in2/19/20082/19/20082/19/2008 3:02:17 PMPPART
tim Phone #: ###-####
BLD07-03247 BLD-Conference2/19/20082/19/20082/19/2008 2:06:02 PMPPASS
mark or steve Phone #: ###-#### or ###-####. Interior partition walls only one sided, framing ok. Needs to remove screws from clips in grid ceiling.
BLD07-03010 BLD-Framing/Rough-in2/15/20082/19/20082/19/2008 12:01:39 PMAPART
robert - Note - dry wall Phone #: ###-####. pend. elec.
BLD08-00092 BLD-Final2/15/20082/19/20082/19/2008 12:01:16 PMADONE
robert Phone #: ###-####
BLD08-00092 DOC - Permit Finaled2/19/20082/19/20082/19/2008 12:01:09 PMPPASS
BLD07-03080 BLD-Footing2/14/20082/19/20082/19/2008 11:25:23 AMAPART
Scheduled by a contractor via Hello! on 2/14/2008 at 12:32:56 PM. Contact: ###-####. wip. No approved plans on site, will have approved plans on stemwall insp. Noted to contractor that any deviations fromm approved plan will be repaired or replaced.
BLD07-02159 BLD-Framing/Rough-in2/15/20082/19/20082/19/2008 10:53:51 AMAPART
ron Phone #: ###-####. Need truss engineering. Needs to finish installing clips on 2hr wall, finish nailing off hangars, provide straps, stud shoes were needed. ok to insul.
BLD07-02226 BLD-Footing2/19/20082/19/20082/19/2008 10:52:15 AMAPART
Scheduled by a contractor via Hello! on 2/19/2008 at 7:03:33 AM. Contact: ###-####. wip. footing subgrade has dried.
BLD07-02177 BLD-Footing2/19/20082/19/20082/19/2008 10:51:43 AMAPASS
Scheduled by a contractor via Hello! on 2/19/2008 at 7:02:20 AM. Contact: ###-####.