Inspections for the day of: Tuesday, February 19, 2008.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC08-00095 Site Preparation2/13/20082/19/20082/19/2008 3:11:41 PMAPART
Project has not started. NO sign or RP for project. Called Eric Cronin ###-#### and left a message to figure out info on project and explained to him that a RP is needed. Instructed him to contact me with this info.

CAS
#460
###-####
ESC08-00094 Site Preparation2/13/20082/19/20082/19/2008 3:08:00 PMAPASS
stabilized entrance installed crrectly and sediment control (wattle) installed.

CAS
#460
###-####
ESC06-01299 BMP Violation2/14/20082/19/20082/19/2008 2:58:15 PMPPASS
Put in a entrance into there staging area and and is working well. Also all concrete spoils have been removed and a portable washout area has been constructed.
CAS
#460
###-####
ESC08-00024 Site Final2/19/20082/19/20082/19/2008 1:38:13 PMPPASS
Passed site. Due to work starting under 30 days site does not need to be stabilized
ESC08-00036 Site Final2/19/20082/19/20082/19/2008 12:00:00 AMPPASS
Jon, ###-####