ESC08-00095
| Site Preparation | 2/13/2008 | 2/19/2008 | 2/19/2008 3:11:41 PM | A | PART |
|
|
Project has not started. NO sign or RP for project. Called Eric Cronin ###-#### and left a message to figure out info on project and explained to him that a RP is needed. Instructed him to contact me with this info.
CAS #460 ###-####
|
ESC08-00094
| Site Preparation | 2/13/2008 | 2/19/2008 | 2/19/2008 3:08:00 PM | A | PASS |
|
|
stabilized entrance installed crrectly and sediment control (wattle) installed.
CAS #460 ###-####
|
ESC06-01299
| BMP Violation | 2/14/2008 | 2/19/2008 | 2/19/2008 2:58:15 PM | P | PASS |
|
|
Put in a entrance into there staging area and and is working well. Also all concrete spoils have been removed and a portable washout area has been constructed. CAS #460 ###-####
|
ESC08-00024
| Site Final | 2/19/2008 | 2/19/2008 | 2/19/2008 1:38:13 PM | P | PASS |
|
|
Passed site. Due to work starting under 30 days site does not need to be stabilized
|
ESC08-00036
| Site Final | 2/19/2008 | 2/19/2008 | 2/19/2008 12:00:00 AM | P | PASS |
|
|
Jon, ###-####
|