Inspections for the day of: Thursday, February 19, 2009.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR08-00725 INSP-Final Inspection2/18/20092/19/20092/20/2009 3:42:38 PMAFAIL
Items needed for final include lock at circut breaker to the panel, repair one manual pull station at building 1308 1st floor NE side, correct switched descriptors at the first two buildings, resolve issue with note #5 on project attatched fire code review comments.
FIR08-00018 INSP-Sprinkler Rough-in/Hydro2/18/20092/19/20092/20/2009 3:22:56 PMACANC
1st, 9th and 11th Floor R-In Inspection:

Contact: Jeff Phone #: ###-#### x1234 Internet Inspection Request from: Alicia Pauley * Canceled per phone call from contractor.*
FIR08-00104 INSP-Alarm Testing2/18/20092/19/20092/19/2009 4:46:46 PMPPART
One damper 6th floor and two dampers 1st floor need repair, notification and unit smoke alarms 1st thru 6th floors tested acceptable, noted corrections made, verified signals sent from previous inspection, see plans for red line annotations on adjustments to be done.
FIR08-00045 INSP-Final Inspection2/19/20092/19/20092/19/2009 4:42:47 PMPNR
casey - please call 1/2 hr prior Phone #: ###-####
FIR07-01042 INSP-Final Inspection2/18/20092/19/20092/19/2009 4:41:17 PMAPART
See inspection comments per T. Frost.
FIR07-00928 INSP-Final Inspection2/18/20092/19/20092/19/2009 4:40:24 PMAPART
See inspection comments per T. Frost.
FIR09-00009 INSP-Final Inspection2/18/20092/19/20092/19/2009 12:57:59 PMACANC
Overbooked
FIR07-00971 INSP-Final Inspection2/18/20092/19/20092/19/2009 12:49:32 PMADEFR
Casey- call 30 mins prior to going Phone #: ###-#### * NOTE * Wrong permit number requested by contractor-Intended for project related fire sprinkler work.
FIR07-01012 INSP-Final Inspection2/18/20092/19/20092/19/2009 12:47:14 PMAPASS
Final fire alarm site inspection passed, scope of permit work completed.
FIR09-00100 INSP-Final Inspection2/18/20092/19/20092/19/2009 12:44:53 PMAPASS
Fire sprinkler system modifications okayed at the elevator hoistway, permit finaled.
BLD06-01451 FIRE-Conference2/18/20092/19/20092/19/2009 12:43:42 PMADONE
Forrest; Can we get our "Life/Safety" done, or at least started, Thursday am? If you have a check-off list, I will be glad to use it to make sure I have not missed something. Let me know.
Thanks, Bob Phone #: ###-#### Internet Inspection Request from: bob austin
FIR08-00766 INSP-Sprinkler Rough-in/Hydro2/18/20092/19/20092/19/2009 12:43:14 PMAPART
See approved plans for underground fire supply line pipe runs okayed for cover, added 45's for change in bury depth below the storm drain adjacent to Freight Street to be indicated on as-builts, also need to verify thrust blocking/deadmans at top 45's prior to cover.